scientific article; zbMATH DE number 90002
From MaRDI portal
Publication:4018286
Recommendations
- On the economic lot scheduling problem with backlogging: The common cycle approach
- The common cycle economic lot scheduling problem with backorders: Benefits of controllable production rates
- The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
- Single item lot-sizing problems with backlogging on a single machine at a finite production rate
Cited in
(34)- Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives
- Cyclic lot-sizing problems with sequencing costs
- Hybrid genetic algorithm for the economic lot-scheduling problem
- Economic lot scheduling with resources in parallel
- Solving the capacitated lot-sizing problem with backorder consideration
- The economic lot scheduling problem without capacity constraints
- Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach
- Single-stage resource allocation and economic lot scheduling on multiple, nonidentical production lines
- On the economic lot scheduling problem with backlogging: The common cycle approach
- The use of genetic algorithms to solve the economic lot size scheduling problem
- Single item lot-sizing problems with backlogging on a single machine at a finite production rate
- scientific article; zbMATH DE number 2247879 (Why is no real title available?)
- Cyclic scheduling to minimize inventory in a batch flow line
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- A unifying approximate dynamic programming model for the economic lot scheduling problem
- Economic lot scheduling problems incorporating a cost of using the production facility
- A fast computational procedure to solve the multi-item single machine lot scheduling optimization problem: The average cost case
- The finite horizon economic lot scheduling in flexible flow lines
- A note on linear programming and the single machine lot size scheduling problem
- How to avoid stockouts when producing several items on a single facility? What to do if you can't?
- Scheduling N Products On A Single Facility With Back-Ordering And Eixed Terminal Inventory
- SchedulingNproducts on a single facility with allowed backordering
- scientific article; zbMATH DE number 4089307 (Why is no real title available?)
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- A profit-maximizing economic lot scheduling problem with price optimization
- Cyclical schedules for one-warehouse, multi-retailer systems with dynamic demands
- A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters
- Strategic investment to reduce setup times in the economic lot scheduling problem
- Scheduling Economic Lot Size Production Runs
- Lower bounds for the economic lot scheduling problem using aggregation
- Reduced production rates in the economic lot scheduling problem
- Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs
- Economic lot scheduling with uncontrolled co-production
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4018286)