Hybrid genetic algorithm for the economic lot-scheduling problem
From MaRDI portal
Publication:4706269
DOI10.1080/00207540110095222zbMath1063.90520OpenAlexW1999513701MaRDI QIDQ4706269
Sangjin Choi, Edward A. Silver, Il-Kyeong Moon
Publication date: 2002
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540110095222
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (10)
Accounting for idle capacity cost in the scheduling of economic lot sizes ⋮ Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case ⋮ The economic lot scheduling problem: a pure genetic search approach ⋮ Planning of multi-product pipelines by economic lot scheduling models ⋮ Optimization of economic lot scheduling problem with backordering and shelf-life considerations using calibrated metaheuristic algorithms ⋮ A genetic algorithm for solving the economic lot scheduling problem in flow shops ⋮ Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach ⋮ A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains ⋮ Replenishment policy based on modified ant colony optimisation and statistical analysis under the pre-order penetration point ⋮ Hybrid genetic algorithm for group technology economic lot scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- The use of genetic algorithms to solve the economic lot size scheduling problem
- Controllable production rates in a family production context
- The G-group heuristic for single machine lot scheduling
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- The Cyclic Lot Scheduling Problem with Sequence-Dependent Setups
- Lot Sizing and Sequencing for N Products on One Facility
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Optimal cycle time and production rate in a family production context with shelf life considerations
- Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions
- Dealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rate
- Reduced production rates in the economic lot scheduling problem
- Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Strategic investment to reduce setup times in the economic lot scheduling problem
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
This page was built for publication: Hybrid genetic algorithm for the economic lot-scheduling problem