Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
From MaRDI portal
Publication:3981509
DOI10.1287/opre.39.1.56zbMath0747.90033OpenAlexW2092550662MaRDI QIDQ3981509
Publication date: 26 June 1992
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.39.1.56
Sensitivity, stability, parametric optimization (90C31) Production models (90B30) Inventory, storage, reservoirs (90B05) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Integration of lotsizing and scheduling decisions in a job-shop ⋮ Agile factorial production for a single manufacturing line with multiple products ⋮ Quasi-fixed cyclic production schemes for multiple products with stochastic demand ⋮ How to avoid stockouts when producing several items on a single facility? What to do if you can't? ⋮ Accounting for idle capacity cost in the scheduling of economic lot sizes ⋮ Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case ⋮ The economic lot scheduling problem: a pure genetic search approach ⋮ Discrete-time, economic lot scheduling problem on multiple, non-identical production lines ⋮ Medium term production management for cyclic deliveries ⋮ Modeling industrial lot sizing problems: a review ⋮ Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach ⋮ Economic lot scheduling with uncontrolled co-production ⋮ Production planning for a multi-item, single-stage kanban system ⋮ The economic lot scheduling problem under extended basic period and power-of-two policy ⋮ An improved algorithm for solving the economic lot size problem (ELSP) ⋮ Alternative control mechanisms for cyclical scheduling systems ⋮ Economic lot scheduling problems incorporating a cost of using the production facility ⋮ The peak load minimization problem in cyclic production ⋮ Integrated inventory model for similar products under a two-echelon supply chain environment: an empirical study ⋮ Reduced production rates in the economic lot scheduling problem ⋮ Hybrid genetic algorithm for the economic lot-scheduling problem ⋮ Optimal production planning in pull flow lines with multiple products ⋮ Lot sizing and scheduling -- survey and extensions ⋮ The use of genetic algorithms to solve the economic lot size scheduling problem ⋮ A hybrid heuristic and linear programming approach to multi-product machine scheduling ⋮ Hybrid genetic algorithm for group technology economic lot scheduling problem
Uses Software