Economic lot scheduling problems incorporating a cost of using the production facility
From MaRDI portal
Publication:3055413
Recommendations
- Economic lot scheduling problem with imperfect production processes
- Economic lot scheduling problem with imperfect production processes and setup times
- Economic lot scheduling with deliberated and controlled coproduction
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Scheduling Economic Lot Size Production Runs
- Scheduling economic lot sizes in deteriorating production systems
- Reduced production rates in the economic lot scheduling problem
- Discrete-time, economic lot scheduling problem on multiple, non-identical production lines
- A profit-maximizing economic lot scheduling problem with price optimization
Cites work
- scientific article; zbMATH DE number 90002 (Why is no real title available?)
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- A basic period approach to the economic lot scheduling problem with shelf life considerations
- A scheduling policy for adjusting economic lot quantities to a feasible solution
- An extension of the extended basic period approach for economic lot scheduling problems
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- Finding effective schedules for the economic lot scheduling problem: A simple mixed integer programming approach
- Lot Sizes, Lead Times and In-Process Inventories
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- The economic lot scheduling problem under power-of-two policy
- The economic lot scheduling problem without capacity constraints
Cited in
(8)- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach
- Economic lot scheduling with resources in parallel
- A basic period approach to the economic lot scheduling problem with shelf life considerations
- New heuristics for solving the economic lot scheduling problem with reworks
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- Accounting for idle capacity cost in the scheduling of economic lot sizes
- Discrete-time, economic lot scheduling problem on multiple, non-identical production lines
- Economic lot scheduling problem with imperfect production processes and setup times
This page was built for publication: Economic lot scheduling problems incorporating a cost of using the production facility
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3055413)