Scheduling economic lot sizes in deteriorating production systems
From MaRDI portal
Publication:4456089
DOI10.1002/NAV.10082zbMATH Open1043.90028OpenAlexW2130562829MaRDI QIDQ4456089FDOQ4456089
Author name not available (Why is that?)
Publication date: 15 March 2004
Published in: Naval Research Logistics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.10082
Reliability, availability, maintenance, inspection in operations research (90B25) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Cites Work
Cited In (13)
- Economic production lot sizing with two independent/dependent imperfect key subsystems
- Production decision making considering dual material types and setup time uncertainty
- Economic lot scheduling problem with imperfect production processes and setup times
- Economic production quantity with the presence of imperfect quality and random machine breakdown and repair based on the artificial bee colony heuristic
- Production lot sizing with process deterioration and machine breakdown
- Title not available (Why is that?)
- A demand partitioning framework to reserve production for small enterprises
- Economic lot scheduling problems incorporating a cost of using the production facility
- Economic lot scheduling problem with imperfect production processes
- Determining a common production cycle time for an economic lot scheduling problem with deteriorating items
- Economic lot sizing with the consideration of random machine unavailability time
- New lot-sizing formulations for less nervous production schedules
- Production inventory model with disruption considering shortage and time proportional demand
Recommendations
- Economic lot scheduling problem with imperfect production processes and setup times π π
- Economic lot scheduling problem with imperfect production processes π π
- Determining a common production cycle time for an economic lot scheduling problem with deteriorating items π π
- A variable production scheduling policy for deteriorating items π π
- Production lot sizing with process deterioration and machine breakdown π π
This page was built for publication: Scheduling economic lot sizes in deteriorating production systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4456089)