Economic lot scheduling with resources in parallel
From MaRDI portal
Publication:2997891
DOI10.1080/00207543.2010.532931zbMath1211.90083OpenAlexW2083032800MaRDI QIDQ2997891
Çağrı Haksöz, Michael L. Pinedo
Publication date: 10 May 2011
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207543.2010.532931
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Uses Software
Cites Work
- Lot sizing and scheduling -- survey and extensions
- Economic lot scheduling problems incorporating a cost of using the production facility
- Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Product grouping for batch processes
This page was built for publication: Economic lot scheduling with resources in parallel