Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
From MaRDI portal
Publication:3985153
Recommendations
- A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
Cited in
(8)- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- A scheduling policy for adjusting economic lot quantities to a feasible solution
- Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- The stochastic economic lot scheduling problem: a survey
- Economic lot scheduling problems incorporating a cost of using the production facility
- Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem
- A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem
This page was built for publication: Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3985153)