A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
From MaRDI portal
Publication:4834355
Recommendations
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- Determining production schedules under base-stock policies in single facility multi-item production systems
- A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem
- Dynamic control in multi-item production/inventory systems
Cited in
(9)- Determining production schedules under base-stock policies in single facility multi-item production systems
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand
- An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production
- A scheduling policy for adjusting economic lot quantities to a feasible solution
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- A hybrid heuristic and linear programming approach to multi-product machine scheduling
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times
- Heuristics for theN-product,M-stage, economic lot sizing and scheduling problem with dynamic demand
This page was built for publication: A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4834355)