How to avoid stockouts when producing several items on a single facility? What to do if you can't?
From MaRDI portal
Publication:1906943
DOI10.1016/0305-0548(95)O0020-TzbMath0840.90054OpenAlexW4249785124MaRDI QIDQ1906943
Guillermo Gallego, Il-Kyeong Moon
Publication date: 22 February 1996
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(95)o0020-t
polynomial algorithmsmixed integer linear programmingmultiple product single facility stockout avoidance problemsweighted stockout problem
Related Items (2)
Economic lot sizing with the consideration of random machine unavailability time ⋮ Supply-chain coordination model with insufficient production capacity and option for outsourcing
Cites Work
- Unnamed Item
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions
- Strategic investment to reduce setup times in the economic lot scheduling problem
- Testing Feasibility in a Lot Scheduling Problem
- Scheduling the Production of Several Items with Random Demands in a Single Facility
This page was built for publication: How to avoid stockouts when producing several items on a single facility? What to do if you can't?