Testing Feasibility in a Lot Scheduling Problem
From MaRDI portal
Publication:5202003
DOI10.1287/OPRE.38.6.1079zbMATH Open0723.90016OpenAlexW2013040772MaRDI QIDQ5202003FDOQ5202003
Publication date: 1990
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.38.6.1079
Computational methods for problems pertaining to operations research and mathematical programming (90-08) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cited In (4)
- How to avoid stockouts when producing several items on a single facility? What to do if you can't?
- Towards real-time automated stowage planning -- optimizing constraint test ordering
- On the economic lot scheduling problem with backlogging: The common cycle approach
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
Recommendations
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes π π
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine π π
- Feasibility of scheduling lot sizes of two frequencies on one machine π π
- Two heuristics for the economic lot scheduling problem: An experimental study π π
- Multilevel capacitated lotsizing complexity and LP-based heuristics π π
This page was built for publication: Testing Feasibility in a Lot Scheduling Problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5202003)