Optimality conditions for the continuous model of the final open pit problem
The authors discuss optimality conditions for the ``final open pit problem. Here they model a pit as a depth function \(p\) over some domain \(\Omega \subset \mathbb{R}^d\), to be determined, maximizing the gain obtained from excavating the pit. For with additional constraints on the function values of \(p\), its slope, and a bound on the associated costs of the excavation. For this problem, the authors derive optimality conditions for the case \(d = 1\) and \(d =2\). In the case \(d=2\), the authors only provide conditions on subdomains \(\Omega_0 \subset \Omega\) on which the slope constraints remain inactive.
- Optimal pits and optimal transportation
- Duality results for stationary problems of open pit mine planning in a continuous function framework
- A continuous framework for open pit mine planning
- scientific article; zbMATH DE number 758128
- A mathematical programming viewpoint for solving the ultimate pit problem
- A continuous framework for open pit mine planning
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- An application of branch and cut to open pit mine scheduling
- Duality results for stationary problems of open pit mine planning in a continuous function framework
- scientific article; zbMATH DE number 1250364 (Why is no real title available?)
- scientific article; zbMATH DE number 862903 (Why is no real title available?)
- scientific article; zbMATH DE number 5244953 (Why is no real title available?)
- Implicit Functions and Solution Mappings
- Optimal control
- Optimal pits and optimal transportation
- What is the optimal cutoff surface for ore bodies with more than one mineral?
- Optimal pits and optimal transportation
- Duality results for stationary problems of open pit mine planning in a continuous function framework
- Optimal control approaches for open pit planning
- A continuous framework for open pit mine planning
This page was built for publication: Optimality conditions for the continuous model of the final open pit problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q828728)