Optimum rectifying inspection plans
From MaRDI portal
Recommendations
Cited in
(11)- Quality investment and inspection policy in a supplier-manufacturer supply chain
- An optimal plan of zero-defect single-sampling by attributes for incoming inspections in assembly lines
- scientific article; zbMATH DE number 5665028 (Why is no real title available?)
- Rectifying Inspection for Defects
- scientific article; zbMATH DE number 4068126 (Why is no real title available?)
- scientific article; zbMATH DE number 1133209 (Why is no real title available?)
- A Process Control Plan with Two-Phase Inspection
- An optimal repeat inspection plan with several classifications
- An Optimal Complete Inspection Plan for Critical Multicharacteristic Components
- A note on some modified Pulak and Al-Sultan's model
- Design of Minimum Average Total Inspection Sampling Plans
This page was built for publication: Optimum rectifying inspection plans
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2758475)