Optimum replacement policies with delay
From MaRDI portal
Cited in
(13)- A two-unit parallel system supported by (n− 2) standbys with general and non-identical lifetimes
- Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
- Optimization of preventive maintenance for two-unit cold standby redundant systems with a general cost structure
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
- Optimum age replacement of a system subject to shocks with random lead time
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- Repair limit replacement policies with lead time
- Implementing a bivariate ordering and replacement policy for deteriorating systems with two failure types
- Optimum checking request policies
- Number-dependent replacement model with random lead-time for systems under maintenance continuously
- Age replacement policy with lead-time for a system subject to non-homogeneous pure birth shocks
- Instandhaltungsmodelle - Eine Übersicht. II
- Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
This page was built for publication: Optimum replacement policies with delay
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4777036)