Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
From MaRDI portal
Publication:2430630
Recommendations
- Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
- Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
- Optimal age-replacement model with minimal repair based on a cumulative damage limit policy
- A periodical replacement model based on cumulative repair-cost limit
- Age Replacement Policy With Age-Dependent Minimal Repair*
Cites work
- A Combined Block and Repair Limit Replacement Policy
- A general ordering policy with number-dependent minimal repair and random lead time
- A graphical method to repair-cost limit replacement policies with imperfect repair.
- A Marginal Cost Analysis for an Age Replacement Policy With Minimal Repair†
- A modified block replacement policy with two variables and general random minimal repair cost
- A Modified Block Replacement with Two Variables
- A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting
- A Note on the Repair Limit Replacement Policy
- A Replacement Policy Based on Limits for the Repair Cost Rate
- Age Replacement with Leadtime
- Age-dependent minimal repair
- An Age Replacement Policy with Minimal Repair Cost Limit
- An extended optimal replacement model of systems subject to shocks
- An imperfect maintenance model with block replacements
- Analysis of a system with minimal repair and its application to replacement policy
- Extended optimal age-replacement policy with minimal repair of a system subject to shocks
- Extended optimal replacement model with random minimal repair costs
- GENERALIZED MODELS FOR DETERMINING OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT
- scientific article; zbMATH DE number 4026633 (Why is no real title available?)
- scientific article; zbMATH DE number 219841 (Why is no real title available?)
- scientific article; zbMATH DE number 3215084 (Why is no real title available?)
- scientific article; zbMATH DE number 3326956 (Why is no real title available?)
- scientific article; zbMATH DE number 3338194 (Why is no real title available?)
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- Optimal block replacement policies with multiple choice at failure
- Optimal Number of Failures before Replacement Time
- Optimal Number of Minimal Repairs before Replacement
- Optimal number of minimal repairs before replacement of a system subject to shocks
- Optimal number of minor failures before replacement
- Optimum Preventive Maintenance Policies
- Optimum Replacement of a System Subject to Shocks
- Optimum replacement policies with delay
- Periodic replacement when minimal repair costs vary with time
- Periodic Replacement with Increasing Minimal Repair Costs at Failure
- Replacement Policies under Minimal Repair
- Some replacement policies with minimal repairs and repair cost limit
- The Age Replacement Problem with Minimal Repair and Random Repair Costs
- The Optimum Repair Limit Replacement Policies
Cited in
(16)- Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting
- Group maintenance policies for an \(R\)-out-of-\(N\) system with phase-type distribution
- Age replacement policy for a two-unit system subject to non-homogeneous pure birth shocks
- A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
- Optimal number of minimal repairs with cumulative repair cost limit for a two-unit system with failure rate interactions
- Number-dependent replacement model with random lead-time for systems under maintenance continuously
- Optimal replacement policy for a repairable system with deterioration based on a renewal-geometric process
- Over-time and over-level replacement policies with random working cycles
- Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
- Optimal age-replacement model with minimal repair based on a cumulative damage limit policy
- Age Replacement Policy With Age-Dependent Minimal Repair*
- Comments on Finite-Period Applications of Age-Based Replacement Models
- Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance
- Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
- Generalized multi-parameter preventive replacement policy for systems with random processing times
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
This page was built for publication: Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2430630)