Optimal number of minor failures before replacement
From MaRDI portal
Recommendations
- REPLACEMENT POLICIES IN THE CASE THAT FAILURE DISTRIBUTIONS DEPEND ON THE NUMBER OF FAILURES
- Extended optimal replacement model with random minimal repair costs
- Some replacement policies with minimal repairs and repair cost limit
- A generalized model for determining optimal number of minimal repairs before replacement
- A summary of replacement models with changing failure distributions
Cites work
Cited in
(18)- Extended optimal replacement model with random minimal repair costs
- A generalized model for determining optimal number of minimal repairs before replacement
- An optimal number-dependent preventive maintenance strategy for offshore wind turbine blades considering logistics
- A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
- Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy
- An extended optimal replacement model of systems subject to shocks
- A repair policy with limited number of minimal repairs
- A bivariate optimal replacement policy for a system with age-dependent minimal repair and cumulative repair-cost limit
- Number-dependent replacement model with random lead-time for systems under maintenance continuously
- A summary of replacement models with changing failure distributions
- Optimal two-threshold replacement policy in a cumulative damage model
- REPLACEMENT POLICIES IN THE CASE THAT FAILURE DISTRIBUTIONS DEPEND ON THE NUMBER OF FAILURES
- Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy
- Optimal age-replacement time with minimal repair based on cumulative repair cost limit and random lead time
- Optimal number of minimal repairs before ordering spare for preventive replacement
- Extended replacement policy for a system under shocks effect
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
- Extended optimal age-replacement policy with minimal repair of a system subject to shocks
This page was built for publication: Optimal number of minor failures before replacement
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4721477)