An optimal number-dependent preventive maintenance strategy for offshore wind turbine blades considering logistics
DOI10.1155/2013/205847zbMATH Open1291.90083DBLPjournals/advor/ShafieePS13OpenAlexW2031078572WikidataQ58919060 ScholiaQ58919060MaRDI QIDQ2248694FDOQ2248694
Authors: Mahmood Shafiee, Ann-Brith Strömberg, Michael Patriksson
Publication date: 27 June 2014
Published in: Advances in Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2013/205847
Recommendations
- Maintenance optimization for a single wind turbine component under time-varying costs
- Optimal joint maintenance and orienteering strategy for complex mission-oriented systems: a case study in offshore wind energy
- Optimisation of maintenance routing and scheduling for offshore wind farms
- Optimizing and evaluating a maintenance strategy for multi-component systems
- Simulation-based optimisation for stochastic maintenance routing in an offshore wind farm
Reliability, availability, maintenance, inspection in operations research (90B25) Transportation, logistics and supply chain management (90B06)
Cites Work
- Title not available (Why is that?)
- Shock and damage models in reliability theory
- Random lead times and expedited orders in \((Q,r)\) inventory systems
- Optimal Number of Minimal Repairs before Replacement
- Extended optimal replacement model with random minimal repair costs
- A generalized model for determining optimal number of minimal repairs before replacement
- GENERALIZED MODELS FOR DETERMINING OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT
- Optimal number of minor failures before replacement
- Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks
- Optimal number of minimal repairs before replacement of a system subject to shocks
- Title not available (Why is that?)
- Optimal age-replacement policy of a system subject to shocks with random lead-time
- A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times
- Optimal number of minimal repairs before ordering spare for preventive replacement
Cited In (3)
- Maintenance optimization for a single wind turbine component under time-varying costs
- Simultaneous scheduling of replacement and repair of common components in operating systems. A multi-objective mathematical optimization model
- Scheduling the repair and replacement of individual components in operating systems: a bi-objective mathematical optimization model
This page was built for publication: An optimal number-dependent preventive maintenance strategy for offshore wind turbine blades considering logistics
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2248694)