Parcel Distribution Timetabling Problem with Incomplete Hub Network
From MaRDI portal
Recommendations
- Multiobjective multiproduct parcel distribution timetabling: a real-world application
- A bi-objective incomplete hub location-routing problem with flow shipment scheduling
- Flow shipment scheduling in an incomplete hub location-routing network design problem
- Release time scheduling and hub location for next-day delivery
- The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds
Cites work
- A hub covering model for cargo delivery systems
- A Mathematical Model for Periodic Scheduling Problems
- A tabu-search based heuristic for the hub covering problem over incomplete hub networks
- An experimental comparison of periodic timetabling models
- Hub arc location problems: I. Introduction and results
- Hub Arc Location Problems: Part II—Formulations and Optimal Algorithms
- Multiobjective multiproduct parcel distribution timetabling: a real-world application
- Nominal and robust train timetabling problems
- Planning models for freight transportation
- Planning models for long-haul operations of postal and express shipment companies
- Service network design for freight transportation: a review
- Service network design in freight transportation
- The latest arrival hub location problem
This page was built for publication: Parcel Distribution Timetabling Problem with Incomplete Hub Network
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q6160431)