Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
From MaRDI portal
Recommendations
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
- Mixed-model assembly line sequencing using beam search
- Sequencing mixed-model assembly lines to minimize part inventory cost
Cited in
(12)- Sequencing mixed-model assembly lines: survey, classification and model critique
- Line configuration to minimize setup costs
- Integer programming models versus advanced planning business software for a multi-level mixed-model assembly line problem
- Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant
- A survey on problems and methods in generalized assembly line balancing
- Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
- A mathematical model for selecting mixed models with due dates
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
- Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
- A scatter search based hyper-heuristic for sequencing a mixed-model assembly line
- Mixed-model sequencing with stochastic failures: a case study for automobile industry
- Sequencing mixed-model assembly lines to minimize part inventory cost
This page was built for publication: Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2567867)