Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant
From MaRDI portal
Publication:2253383
DOI10.1016/j.ejor.2012.07.006zbMath1292.90180OpenAlexW2083991341MaRDI QIDQ2253383
Alberto Cano, Joaquín Bautista, Rocío Alfaro
Publication date: 27 July 2014
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2012.07.006
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Case-oriented studies in operations research (90B90)
Uses Software
Cites Work
- Unnamed Item
- Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules
- A GRASP approach for the extended car sequencing problem
- Ant algorithms for a time and space constrained assembly line balancing problem
- A beam search approach for the optimization version of the car sequencing problem
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Heuristics and exact algorithms for solving the Monden problem
- Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- A mathematical model for selecting mixed models with due dates
- Sequencing problem for a mixed-model assembly line in the Toyota production system
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
- Mixed-model assembly line sequencing using beam search
This page was built for publication: Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant