scientific article; zbMATH DE number 1091563
From MaRDI portal
Publication:4367282
DOI10.1002/(SICI)1520-6750(199708)44:5%3C419::AID-NAV2%3E3.0.CO;2-7zbMATH Open0891.90082MaRDI QIDQ4367282FDOQ4367282
Publication date: 25 November 1997
Title of this publication is not available (Why is that?)
Cited In (7)
- Least in-sequence probability heuristic for mixed-volume production lines
- Algorithms for the car sequencing and the level scheduling problem
- A mathematical model for selecting mixed models with due dates
- Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant
- A scatter search based hyper-heuristic for sequencing a mixed-model assembly line
- A Lagrangean relaxation approach for the mixed-model flow line sequencing problem
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches
Recommendations
- Stochastic procedures for scheduling minimum job sets on mixed model assembly lines π π
- Sequencing mixed-model assembly lines to level parts usage and minimize line length π π
- A new approach for mixed-model assembly line sequencing π π
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems π π
- Sequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithms π π
- Sequencing mixed-model assembly lines to minimize part inventory cost π π
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints π π
- Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules π π
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4367282)