Algorithms for real-time scheduling of jobs on mixed model assembly lines
From MaRDI portal
Publication:1321799
DOI10.1016/0305-0548(94)90098-1zbMath0799.90069OpenAlexW1967877225MaRDI QIDQ1321799
Mehmet Savsar, Mohammed A. Al-Fawzan, Ahmet Bolat
Publication date: 3 May 1994
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(94)90098-1
branch and boundsequencingheuristic algorithmsmixed model assembly linereal-time scheduling of jobstotal setup and utility work costs
Related Items (11)
Flow-shop scheduling for three serial stations with the last two duplicate ⋮ Sequencing in mixed model assembly lines: A genetic algorithm approach ⋮ Integrated real-time control of mixed-model assembly lines and their part feeding processes ⋮ A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. ⋮ A Lagrangean relaxation approach for the mixed-model flow line sequencing problem ⋮ Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line ⋮ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems ⋮ Sequencing mixed-model assembly lines to minimize part inventory cost ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ A mathematical model for selecting mixed models with due dates ⋮ Controlling mixed-model assembly lines in real-time by using distributed systems
Cites Work
This page was built for publication: Algorithms for real-time scheduling of jobs on mixed model assembly lines