Sequencing mixed-model assembly lines to minimize part inventory cost
From MaRDI portal
Publication:991825
DOI10.1007/s00291-007-0095-2zbMath1193.90017MaRDI QIDQ991825
Nils Boysen, Malte Fliedner, Armin Scholl
Publication date: 8 September 2010
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/servlets/MCRFileNodeServlet/dbt_derivate_00020953/2007-3.pdf
dynamic programming; sequencing; ant colony optimization; mixed-model assembly line; consignment stock
90C59: Approximation methods and heuristics in mathematical programming
90B05: Inventory, storage, reservoirs
90C39: Dynamic programming
Related Items
On the part inventory model sequencing problem: complexity and beam search heuristic, Truck scheduling at zero-inventory cross docking terminals, Level scheduling for batched JIT supply, The product rate variation problem and its relevance in real world mixed-model assembly lines, Scheduling inbound and outbound trucks at cross docking terminals, Scheduling just-in-time part supply for mixed-model assembly lines, An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem, Level scheduling of mixed-model assembly lines under storage constraints
Cites Work
- Unnamed Item
- Unnamed Item
- Optimization of workcell layouts in a mixed-model assembly line environment
- Algorithms for the car sequencing and the level scheduling problem
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem
- Solving the car sequencing problem via branch \& bound
- Sequencing mixed-model assembly lines: survey, classification and model critique
- Heuristics and exact algorithms for solving the Monden problem
- Algorithms for real-time scheduling of jobs on mixed model assembly lines
- Cyclic just-in-time sequences are optimal
- The maximum deviation just-in-time scheduling problem.
- Minimizing variation of production rates in just-in-time systems: A survey
- Solving real car sequencing problems with ant colony optimization
- Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
- Controlling mixed-model assembly lines in real-time by using distributed systems
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Review and comparison of three methods for the solution of the car sequencing problem
- Stochastic Inventory Systems in a Supply Chain with Asymmetric Information: Cycle Stocks, Safety Stocks, and Consignment Stock
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Note—An Improved Discrete Dynamic Programming Algorithm for Allocating Resources Among Interdependent Projects
- An analytic framework for sequencing mixed model assembly lines
- Branch-and-Bound Strategies for Dynamic Programming
- A hybrid approach to discrete mathematical programming
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Stochastic procedures for scheduling minimum job sets on mixed model assembly lines
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case