Chandrasekharan Rajendran

From MaRDI portal
(Redirected from Person:184549)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Bounding strategies for obtaining a lower bound for n-job and m-machine flowshop scheduling problem with objective of minimising the total flowtime of jobs
International Journal of Operational Research
2025-12-09Paper
Collaborative truck multi-drone delivery system considering drone scheduling and en route operations
Annals of Operations Research
2024-08-19Paper
Mathematical models for green vehicle routing problems with pickup and delivery: a case of semiconductor supply chain
Computers & Operations Research
2018-07-11Paper
The value of information sharing in a serial supply chain with AR(1) demand and non-zero replenishment lead times
European Journal of Operational Research
2018-05-24Paper
A novel particle swarm optimisation algorithm for continuous function optimisation
International Journal of Operational Research
2017-05-31Paper
An improved ant-colony algorithm for the grouping of machine-cells and part-families in cellular manufacturing systems
International Journal of Operational Research
2017-05-31Paper
Heuristic rules for tie-breaking in the implementation of the NEH heuristic for permutation flow-shop scheduling
International Journal of Operational Research
2017-05-31Paper
Variability of completion time differences in permutation flow shop scheduling
Computers & Operations Research
2016-11-10Paper
A genetic algorithm for solving the fixed-charge transportation model: two-stage problem
Computers & Operations Research
2012-11-15Paper
Rationing mechanisms and inventory control-policy parameters for a divergent supply chain operating with lost sales and costs of review
Computers & Operations Research
2011-03-25Paper
Scheduling in resource-constrained multiple projects to minimise the weighted tardiness and weighted earliness of projects
International Journal of Operational Research
2010-05-07Paper
Fast heuristic algorithms to solve a single-stage fixed-charge transportation problem
International Journal of Operational Research
2009-10-28Paper
Branch-and-bound algorithms for scheduling in permutation flowshops to minimize the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of j
The Journal of the Operational Research Society
2009-08-28Paper
A two-phase metaheuristic approach for solving economic lot scheduling problems
International Journal of Operational Research
2009-06-03Paper
Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives
European Journal of Operational Research
2006-10-25Paper
A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs
European Journal of Operational Research
2005-09-28Paper
A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs
The Journal of the Operational Research Society
2005-09-01Paper
Scheduling in flowshops to minimize total tardiness of jobs
International Journal of Production Research
2005-04-26Paper
A simulation-based genetic algorithm for inventory optimization in a serial supply chain
International Transactions in Operational Research
2005-04-15Paper
Development and analysis of cost-based dispatching rules for job shop scheduling
European Journal of Operational Research
2004-08-16Paper
Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs.
European Journal of Operational Research
2004-03-14Paper
Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date
European Journal of Operational Research
2003-12-01Paper
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
International Journal of Production Research
2003-10-01Paper
Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times.
European Journal of Operational Research
2003-07-30Paper
A comparative study of dispatching rules in dynamic flowshops and jobshops
European Journal of Operational Research
2002-08-18Paper
A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
International Journal of Production Research
2002-01-01Paper
Dispatching rules for scheduling in assembly jobshops - Part 2
International Journal of Production Research
2001-12-04Paper
A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs
European Journal of Operational Research
2001-06-26Paper
Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2
International Journal of Production Research
2001-04-19Paper
Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1
International Journal of Production Research
2001-04-19Paper
Dispatching rules for scheduling in assembly jobshops - Part 1
International Journal of Production Research
2000-08-22Paper
New dispatching rules for shop scheduling: A step forward
International Journal of Production Research
2000-08-21Paper
Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types
International Journal of Production Research
2000-08-21Paper
Organizational factors and total quality management an empirical study
International Journal of Production Research
2000-08-21Paper
An instrument for measuring total quality management implementation in manufacturing-based business units in India
International Journal of Production Research
2000-08-21Paper
Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
International Journal of Production Research
1999-06-08Paper
Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2
International Journal of Production Research
1999-06-08Paper
Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop
International Journal of Production Research
1999-03-15Paper
An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
European Journal of Operational Research
1999-03-10Paper
Heuristic for scheduling in a Kanban system with dual blocking mechanisms
European Journal of Operational Research
1999-03-10Paper
Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 1
International Journal of Production Research
1999-03-01Paper
Heuristics for scheduling in flowshop with multiple objectives
European Journal of Operational Research
1999-02-02Paper
A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria
International Journal of Production Research
1998-06-11Paper
A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan
The Journal of the Operational Research Society
1994-05-05Paper
Two-Stage Flowshop Scheduling Problem with Bicriteria
The Journal of the Operational Research Society
1993-01-17Paper
A multi-stage parallel-processor flowshop problem with minimum flowtime
European Journal of Operational Research
1993-01-16Paper
An efficient heuristic approach to the scheduling of jobs in a flowshop
European Journal of Operational Research
1992-10-06Paper
A FLOWSHOP SCHEDULING ALGORITHM TO MINIMIZE TOTAL FLOWTIME
Journal of the Operations Research Society of Japan
1992-06-26Paper
Heuristic algorithms for continuous flow-shop problem1990-01-01Paper


Research outcomes over time


This page was built for person: Chandrasekharan Rajendran