| Publication | Date of Publication | Type |
|---|
| Collaborative truck multi-drone delivery system considering drone scheduling and en route operations | 2024-08-19 | Paper |
| Mathematical models for green vehicle routing problems with pickup and delivery: a case of semiconductor supply chain | 2018-07-11 | Paper |
| The value of information sharing in a serial supply chain with \(AR(1)\) demand and non-zero replenishment lead times | 2018-05-24 | Paper |
| A novel particle swarm optimisation algorithm for continuous function optimisation | 2017-05-31 | Paper |
| An improved ant-colony algorithm for the grouping of machine-cells and part-families in cellular manufacturing systems | 2017-05-31 | Paper |
| Heuristic rules for tie-breaking in the implementation of the NEH heuristic for permutation flow-shop scheduling | 2017-05-31 | Paper |
| Variability of completion time differences in permutation flow shop scheduling | 2016-11-10 | Paper |
| A genetic algorithm for solving the fixed-charge transportation model: two-stage problem | 2012-11-15 | Paper |
| Rationing mechanisms and inventory control-policy parameters for a divergent supply chain operating with lost sales and costs of review | 2011-03-25 | Paper |
| Scheduling in resource-constrained multiple projects to minimise the weighted tardiness and weighted earliness of projects | 2010-05-07 | Paper |
| Fast heuristic algorithms to solve a single-stage fixed-charge transportation problem | 2009-10-28 | Paper |
| Branch-and-bound algorithms for scheduling in permutation flowshops to minimize the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of jobs | 2009-08-28 | Paper |
| A two-phase metaheuristic approach for solving economic lot scheduling problems | 2009-06-03 | Paper |
| Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives | 2006-10-25 | Paper |
| A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs | 2005-09-28 | Paper |
| A fast ant-colony algorithm for single-machine scheduling to minimize the sum of weighted tardiness of jobs | 2005-09-01 | Paper |
| Scheduling in flowshops to minimize total tardiness of jobs | 2005-04-26 | Paper |
| A simulation-based genetic algorithm for inventory optimization in a serial supply chain | 2005-04-15 | Paper |
| Development and analysis of cost-based dispatching rules for job shop scheduling | 2004-08-16 | Paper |
| Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. | 2004-03-14 | Paper |
| Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date | 2003-12-01 | Paper |
| Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem | 2003-10-01 | Paper |
| Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. | 2003-07-30 | Paper |
| A comparative study of dispatching rules in dynamic flowshops and jobshops | 2002-08-18 | Paper |
| A study on the performance of scheduling rules in buffer-constrained dynamic flowshops | 2002-01-01 | Paper |
| Dispatching rules for scheduling in assembly jobshops - Part 2 | 2001-12-04 | Paper |
| A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs | 2001-06-26 | Paper |
| Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2 | 2001-04-19 | Paper |
| Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 1 | 2001-04-19 | Paper |
| Dispatching rules for scheduling in assembly jobshops - Part 1 | 2000-08-22 | Paper |
| New dispatching rules for shop scheduling: A step forward | 2000-08-21 | Paper |
| Scheduling in a Kanban-controlled flowshop with dual blocking mechanisms and missing operations for part-types | 2000-08-21 | Paper |
| Organizational factors and total quality management an empirical study | 2000-08-21 | Paper |
| An instrument for measuring total quality management implementation in manufacturing-based business units in India | 2000-08-21 | Paper |
| Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers | 1999-06-08 | Paper |
| Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2 | 1999-06-08 | Paper |
| Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop | 1999-03-15 | Paper |
| An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs | 1999-03-10 | Paper |
| Heuristic for scheduling in a Kanban system with dual blocking mechanisms | 1999-03-10 | Paper |
| Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 1 | 1999-03-01 | Paper |
| Heuristics for scheduling in flowshop with multiple objectives | 1999-02-02 | Paper |
| A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria | 1998-06-11 | Paper |
| A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan | 1994-05-05 | Paper |
| Two-Stage Flowshop Scheduling Problem with Bicriteria | 1993-01-17 | Paper |
| A multi-stage parallel-processor flowshop problem with minimum flowtime | 1993-01-16 | Paper |
| An efficient heuristic approach to the scheduling of jobs in a flowshop | 1992-10-06 | Paper |
| A FLOWSHOP SCHEDULING ALGORITHM TO MINIMIZE TOTAL FLOWTIME | 1992-06-26 | Paper |
| Heuristic algorithms for continuous flow-shop problem | 1990-01-01 | Paper |