Erwin Pesch

From MaRDI portal
Person:193684

Available identifiers

zbMath Open pesch.erwinMaRDI QIDQ193684

List of research outcomes





PublicationDate of PublicationType
A dynamic programming algorithm for order picking in robotic mobile fulfillment systems2025-01-08Paper
Scheduling in manufacturing with transportation: classification and solution techniques2024-08-13Paper
Planning container inspection and repair: a case study2024-06-06Paper
Fixed interval scheduling with third‐party machines2023-12-11Paper
Single machine scheduling with assignable due dates to minimize maximum and total late work2023-07-10Paper
Cost minimizing planning of container inspection and repair in multiple facilities2023-06-26Paper
Two-machine flow-shop scheduling to minimize total late work: revisited2022-12-23Paper
Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work2022-12-23Paper
Stronger mixed-integer programming-formulations for order- and rack-sequencing in robotic mobile fulfillment systems2022-12-12Paper
An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning2022-06-08Paper
Provision-after-wait with preferences ordered by difference: tighter complexity and better approximation2021-06-03Paper
Minimizing maximum cost for a single machine under uncertainty of processing times2020-05-27Paper
The train-to-yard assignment problem2020-01-15Paper
Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines2019-08-08Paper
Straddle carrier routing at seaport container terminals in the presence of short term quay crane buffer areas2019-07-25Paper
Solving the single crane scheduling problem at rail transshipment yards2019-06-20Paper
Multiproduct batching and scheduling with buffered rework: The case of a car paint shop2019-05-02Paper
A parallel machine schedule updating game with compensations and clients averse to uncertain loss2018-12-17Paper
An overview of revenue management and dynamic pricing models in hotel business2018-08-10Paper
The windy rural postman problem with a time-dependent zigzag option2018-05-25Paper
A note on scheduling container storage operations of two non‐passing stacking cranes2018-04-27Paper
Incentive compatible mechanisms for scheduling two-parameter job agents on parallel identical machines to minimize the weighted number of late jobs2018-04-20Paper
An integrated model for the transshipment yard scheduling problem2018-04-03Paper
Flight gate assignment and recovery strategies with stochastic arrival and departure times2017-07-06Paper
Competitive location and pricing on networks with random utilities2017-06-20Paper
Competitive location under proportional choice: 1-suboptimal points on networks2017-03-06Paper
\((r|p)\)-centroid problems on networks with vertex and edge demand2016-11-11Paper
A branch-and-bound algorithm for the acyclic partitioning problem2016-11-10Paper
The partitioning min-max weighted matching problem2016-10-06Paper
Mathematical formulations for a 1-full-truckload pickup-and-delivery problem2016-07-26Paper
Scheduling dedicated jobs with variative processing times2016-02-23Paper
Approximation algorithms for inventory constrained scheduling on a single machine2016-01-22Paper
Minimizing maximum weight of subsets of a maximum matching in a bipartite graph2015-09-30Paper
A truck scheduling problem arising in intermodal container transportation2015-07-28Paper
Exact algorithms for inventory constrained scheduling on a single machine2014-08-18Paper
Parallel machine scheduling and common due window assignment with job independent earliness and tardiness costs2014-08-01Paper
New bounds and constraint propagation techniques for the clique partitioning problem2014-04-22Paper
New bounds and algorithms for the transshipment yard scheduling problem2014-02-05Paper
An FPTAS for the single-item capacitated economic lot-sizing problem with supply and demand2013-03-05Paper
Flight gate scheduling with respect to a reference schedule2012-11-15Paper
Sequential competitive location on networks2012-08-16Paper
A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints2012-02-19Paper
Revenue Maximization on Parallel Machines2011-04-07Paper
A generic approach to proving NP-hardness of partition type problems2010-11-25Paper
Recursive functions on the plane and FPTASs for production planning and scheduling problems with two facilities2009-11-25Paper
Analysis, modeling and solution of the concrete delivery problem2008-11-18Paper
A single-item economic lot-sizing problem with a non-uniform resource: Approximation2008-04-24Paper
Disruption management in flight gate scheduling2007-10-26Paper
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date2007-10-10Paper
Handbook on Scheduling2007-08-20Paper
A note on the two machine job shop with the weighted late work criterion2007-05-15Paper
Selected papers from the Dagstuhl Workshop2007-05-15Paper
KI 2005: Advances in Artificial Intelligence2006-11-13Paper
An FPTAS for a single-item capacitated economic lot-sizing problem with monotone cost structure2006-06-14Paper
https://portal.mardi4nfdi.de/entity/Q33686652006-02-08Paper
The two-machine flow-shop problem with weighted late work criterion and common due date2005-04-21Paper
A review of exact solution methods for the non-preemptive multiprocessor flowshop problem2005-03-08Paper
Open shop scheduling problems with late work criteria.2004-01-26Paper
A branch-and-bound algorithm for the resource-constrained project scheduling problem2003-08-18Paper
https://portal.mardi4nfdi.de/entity/Q47899122003-04-23Paper
Constraint propagation and problem decomposition: A preprocessing procedure for the job shop problem2003-01-27Paper
The disjunctive graph machine representation of the job shop scheduling problem2002-08-19Paper
https://portal.mardi4nfdi.de/entity/Q44944352002-02-05Paper
https://portal.mardi4nfdi.de/entity/Q27355852001-09-02Paper
Solving the open shop scheduling problem2001-08-27Paper
https://portal.mardi4nfdi.de/entity/Q27123602001-05-06Paper
Constraint propagation techniques for the disjunctive scheduling problem2000-10-26Paper
Model-based inference in CHARME.2000-06-21Paper
Resource-constrained project scheduling: Notation, classification, models, and methods2000-06-14Paper
A note on disjunctive graph representation2000-04-10Paper
The job shop scheduling problem: Conventional and new solution techniques1998-10-18Paper
https://portal.mardi4nfdi.de/entity/Q43803721998-03-15Paper
TSP ejection chains1997-08-11Paper
Constraint Propagation Based Scheduling of Job Shops1997-01-22Paper
Strategies with memories: Local search in an application oriented environment. Applied local search -- a prologue1996-04-29Paper
Evolution based learning in a job shop scheduling environment1995-07-03Paper
Fast Clustering Algorithms1994-08-21Paper
Genetic local search in combinatorial optimization1994-03-24Paper
Competitive location on a network1993-08-25Paper
https://portal.mardi4nfdi.de/entity/Q39943531992-09-17Paper
Efficient characterizations of \(n\)-chromatic absolute retracts1992-06-28Paper
Dismantling absolute retracts of reflexive graphs1989-01-01Paper
A Radon theorem for Helly graphs1989-01-01Paper
Products of absolute retracts1988-01-01Paper
Minimal extensions of graphs to absolute retracts1987-01-01Paper
A characterization of absolute retracts of n-chromatic graphs1985-01-01Paper

Research outcomes over time

This page was built for person: Erwin Pesch