Yeong-Dae Kim

From MaRDI portal
(Redirected from Person:204001)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
Algorithms for a two‐machine flowshop problem with jobs of two classes
International Transactions in Operational Research
2023-11-17Paper
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
Computers & Operations Research
2016-11-17Paper
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Computers & Operations Research
2016-11-10Paper
A Lagrangian heuristic algorithm for a public healthcare facility location problem
Annals of Operations Research
2013-09-03Paper
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
Computers & Operations Research
2012-11-15Paper
Scheduling algorithms for a semiconductor probing facility
Computers & Operations Research
2010-12-01Paper
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout
International Journal of Production Research
2010-11-07Paper
A branch and bound algorithm for determining locations of long-term care facilities
European Journal of Operational Research
2010-06-11Paper
Minimizing total tardiness on a two-machine re-entrant flowshop
European Journal of Operational Research
2009-12-07Paper
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints
The Journal of the Operational Research Society
2009-06-29Paper
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
Journal of Heuristics
2009-03-31Paper
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process
European Journal of Operational Research
2008-04-22Paper
Minimizing total tardiness in an unrelated parallel-machine scheduling problem
The Journal of the Operational Research Society
2007-11-29Paper
Minimizing makespan on an \(m\)-machine re-entrant flowshop
Computers & Operations Research
2007-11-06Paper
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property
Computers & Operations Research
2007-10-19Paper
Heuristics for search sequencing under time-dependent probabilities of existence
Computers & Operations Research
2007-02-19Paper
Scheduling on parallel identical machines to minimize total tardiness
European Journal of Operational Research
2006-12-07Paper
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
International Journal of Production Research
2005-08-25Paper
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness
International Journal of Production Research
2005-04-05Paper
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system
The Journal of the Operational Research Society
2005-04-04Paper
A heuristic algorithm for a production planning problem in an assembly system
The Journal of the Operational Research Society
2005-01-13Paper
A branch and bound algorithm for locating input and output points of departments on the block layout
The Journal of the Operational Research Society
2005-01-13Paper
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network
European Journal of Operational Research
2004-08-16Paper
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems
European Journal of Operational Research
2003-01-21Paper
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions
European Journal of Operational Research
2001-02-22Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
International Journal of Production Research
2000-08-21Paper
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
European Journal of Operational Research
2000-08-06Paper
Layout planning for facilities with fixed shapes and input and output points
International Journal of Production Research
2000-01-01Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
International Journal of Production Research
1999-06-08Paper
A heuristic for setting up a flexible assembly system
International Journal of Production Research
1999-05-17Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems. Erratum
European Journal of Operational Research
1999-03-18Paper
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop
International Journal of Production Research
1999-03-01Paper
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
European Journal of Operational Research
1999-02-22Paper
Minimizing total tardiness in permutation flowshops
European Journal of Operational Research
1998-08-13Paper
A systematic procedure for setting parameters in simulated annealing algorithms
Computers & Operations Research
1998-06-11Paper
A due date-based approach to part type selection in flexible manufacturing systems
International Journal of Production Research
1998-06-11Paper
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
Computers & Operations Research
1997-04-10Paper
Search Heuristics for Resource Constrained Project Scheduling
The Journal of the Operational Research Society
1996-12-01Paper
A backward approach in list scheduling algorithms for multi-machine tardiness problems
Computers & Operations Research
1995-12-13Paper
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates1995-06-27Paper
A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
Computers & Operations Research
1993-08-25Paper
Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness
The Journal of the Operational Research Society
1993-08-23Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems
European Journal of Operational Research
1991-01-01Paper


Research outcomes over time


This page was built for person: Yeong-Dae Kim