Yeong-Dae Kim

From MaRDI portal
Person:204001

Available identifiers

zbMath Open kim.yeong-daeMaRDI QIDQ204001

List of research outcomes

PublicationDate of PublicationType
Algorithms for a two‐machine flowshop problem with jobs of two classes2023-11-17Paper
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times2016-11-17Paper
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times2016-11-10Paper
A Lagrangian heuristic algorithm for a public healthcare facility location problem2013-09-03Paper
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance2012-11-15Paper
Scheduling algorithms for a semiconductor probing facility2010-12-01Paper
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout2010-11-07Paper
A branch and bound algorithm for determining locations of long-term care facilities2010-06-11Paper
Minimizing total tardiness on a two-machine re-entrant flowshop2009-12-07Paper
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints2009-06-29Paper
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint2009-03-31Paper
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process2008-04-22Paper
Minimizing total tardiness in an unrelated parallel-machine scheduling problem2007-11-29Paper
Minimizing makespan on an \(m\)-machine re-entrant flowshop2007-11-06Paper
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property2007-10-19Paper
Heuristics for search sequencing under time-dependent probabilities of existence2007-02-19Paper
Scheduling on parallel identical machines to minimize total tardiness2006-12-07Paper
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop2005-08-25Paper
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness2005-04-05Paper
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system2005-04-04Paper
A heuristic algorithm for a production planning problem in an assembly system2005-01-13Paper
A branch and bound algorithm for locating input and output points of departments on the block layout2005-01-13Paper
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network2004-08-16Paper
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems2003-01-21Paper
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions2001-02-22Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter2000-08-21Paper
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints2000-08-06Paper
Layout planning for facilities with fixed shapes and input and output points2000-01-01Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter1999-06-08Paper
A heuristic for setting up a flexible assembly system1999-05-17Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems. Erratum1999-03-18Paper
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop1999-03-01Paper
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process1999-02-22Paper
Minimizing total tardiness in permutation flowshops1998-08-13Paper
A systematic procedure for setting parameters in simulated annealing algorithms1998-06-11Paper
A due date-based approach to part type selection in flexible manufacturing systems1998-06-11Paper
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure1997-04-10Paper
Search Heuristics for Resource Constrained Project Scheduling1996-12-01Paper
A backward approach in list scheduling algorithms for multi-machine tardiness problems1995-12-13Paper
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates1995-06-27Paper
A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops1993-08-25Paper
Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness1993-08-23Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems1991-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Yeong-Dae Kim