Yeong-Dae Kim

From MaRDI portal
Person:204001

Available identifiers

zbMath Open kim.yeong-daeMaRDI QIDQ204001

List of research outcomes





PublicationDate of PublicationType
Algorithms for a two‐machine flowshop problem with jobs of two classes2023-11-17Paper
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times2016-11-17Paper
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times2016-11-10Paper
A Lagrangian heuristic algorithm for a public healthcare facility location problem2013-09-03Paper
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance2012-11-15Paper
Scheduling algorithms for a semiconductor probing facility2010-12-01Paper
Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout2010-11-07Paper
A branch and bound algorithm for determining locations of long-term care facilities2010-06-11Paper
Minimizing total tardiness on a two-machine re-entrant flowshop2009-12-07Paper
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints2009-06-29Paper
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint2009-03-31Paper
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process2008-04-22Paper
Minimizing total tardiness in an unrelated parallel-machine scheduling problem2007-11-29Paper
Minimizing makespan on an \(m\)-machine re-entrant flowshop2007-11-06Paper
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property2007-10-19Paper
Heuristics for search sequencing under time-dependent probabilities of existence2007-02-19Paper
Scheduling on parallel identical machines to minimize total tardiness2006-12-07Paper
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop2005-08-25Paper
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness2005-04-05Paper
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system2005-04-04Paper
A heuristic algorithm for a production planning problem in an assembly system2005-01-13Paper
A branch and bound algorithm for locating input and output points of departments on the block layout2005-01-13Paper
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network2004-08-16Paper
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems2003-01-21Paper
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions2001-02-22Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter2000-08-21Paper
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints2000-08-06Paper
Layout planning for facilities with fixed shapes and input and output points2000-01-01Paper
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter1999-06-08Paper
A heuristic for setting up a flexible assembly system1999-05-17Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems. Erratum1999-03-18Paper
Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop1999-03-01Paper
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process1999-02-22Paper
Minimizing total tardiness in permutation flowshops1998-08-13Paper
A systematic procedure for setting parameters in simulated annealing algorithms1998-06-11Paper
A due date-based approach to part type selection in flexible manufacturing systems1998-06-11Paper
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure1997-04-10Paper
Search Heuristics for Resource Constrained Project Scheduling1996-12-01Paper
A backward approach in list scheduling algorithms for multi-machine tardiness problems1995-12-13Paper
Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates1995-06-27Paper
A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops1993-08-25Paper
Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness1993-08-23Paper
Algorithms for a class of single-machine weighted tardiness and earliness problems1991-01-01Paper

Research outcomes over time

This page was built for person: Yeong-Dae Kim