| Publication | Date of Publication | Type |
|---|
| Algorithms for a two‐machine flowshop problem with jobs of two classes | 2023-11-17 | Paper |
| Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times | 2016-11-17 | Paper |
| Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times | 2016-11-10 | Paper |
| A Lagrangian heuristic algorithm for a public healthcare facility location problem | 2013-09-03 | Paper |
| Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance | 2012-11-15 | Paper |
| Scheduling algorithms for a semiconductor probing facility | 2010-12-01 | Paper |
| Linear programming and Lagrangian relaxation heuristics for designing a material flow network on a block layout | 2010-11-07 | Paper |
| A branch and bound algorithm for determining locations of long-term care facilities | 2010-06-11 | Paper |
| Minimizing total tardiness on a two-machine re-entrant flowshop | 2009-12-07 | Paper |
| A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints | 2009-06-29 | Paper |
| Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint | 2009-03-31 | Paper |
| A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process | 2008-04-22 | Paper |
| Minimizing total tardiness in an unrelated parallel-machine scheduling problem | 2007-11-29 | Paper |
| Minimizing makespan on an \(m\)-machine re-entrant flowshop | 2007-11-06 | Paper |
| A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property | 2007-10-19 | Paper |
| Heuristics for search sequencing under time-dependent probabilities of existence | 2007-02-19 | Paper |
| Scheduling on parallel identical machines to minimize total tardiness | 2006-12-07 | Paper |
| Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop | 2005-08-25 | Paper |
| A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness | 2005-04-05 | Paper |
| A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system | 2005-04-04 | Paper |
| A heuristic algorithm for a production planning problem in an assembly system | 2005-01-13 | Paper |
| A branch and bound algorithm for locating input and output points of departments on the block layout | 2005-01-13 | Paper |
| Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network | 2004-08-16 | Paper |
| Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems | 2003-01-21 | Paper |
| Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions | 2001-02-22 | Paper |
| Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter | 2000-08-21 | Paper |
| A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints | 2000-08-06 | Paper |
| Layout planning for facilities with fixed shapes and input and output points | 2000-01-01 | Paper |
| Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter | 1999-06-08 | Paper |
| A heuristic for setting up a flexible assembly system | 1999-05-17 | Paper |
| Algorithms for a class of single-machine weighted tardiness and earliness problems. Erratum | 1999-03-18 | Paper |
| Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop | 1999-03-01 | Paper |
| Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process | 1999-02-22 | Paper |
| Minimizing total tardiness in permutation flowshops | 1998-08-13 | Paper |
| A systematic procedure for setting parameters in simulated annealing algorithms | 1998-06-11 | Paper |
| A due date-based approach to part type selection in flexible manufacturing systems | 1998-06-11 | Paper |
| Simulated annealing and genetic algorithms for scheduling products with multi-level product structure | 1997-04-10 | Paper |
| Search Heuristics for Resource Constrained Project Scheduling | 1996-12-01 | Paper |
| A backward approach in list scheduling algorithms for multi-machine tardiness problems | 1995-12-13 | Paper |
| Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates | 1995-06-27 | Paper |
| A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops | 1993-08-25 | Paper |
| Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness | 1993-08-23 | Paper |
| Algorithms for a class of single-machine weighted tardiness and earliness problems | 1991-01-01 | Paper |