A due date-based approach to part type selection in flexible manufacturing systems
From MaRDI portal
Publication:4394252
DOI10.1080/00207549408956986zbMath0902.90080OpenAlexW2064211335MaRDI QIDQ4394252
Yeong-Dae Kim, Candace Arai Yano
Publication date: 11 June 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408956986
Related Items (2)
Exact solution procedures for certain planning problems in flexible manufacturing systems ⋮ A heuristic for setting up a flexible assembly system
Cites Work
- Grouping of parts and components in flexible manufacturing systems
- A decomposition algorithm for the single machine total tardiness problem
- A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience
- Dimensions of manufacturing automation
- A general search sequencing rule for job shop sequencing
- A loading and dispatching problem in a random flexible manufacturing system
- An integrated inventory model for a single product and its raw materials
- Modelling and solving an FMS part selection problem
- Block Angular Structures and the Loading Problem in Flexible Manufacturing Systems
- A Survey of Scheduling Rules
This page was built for publication: A due date-based approach to part type selection in flexible manufacturing systems