An integrated inventory model for a single product and its raw materials
From MaRDI portal
Publication:3753759
DOI10.1080/00207548708919866zbMath0612.90026OpenAlexW1966107619MaRDI QIDQ3753759
Publication date: 1987
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207548708919866
Related Items (12)
JIT purchasing and setup reduction in an integrated inventory model ⋮ Integrated production-inventory model for multi-products on a single facility ⋮ Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage ⋮ Unnamed Item ⋮ An optimal algorithm for integrating raw materials inventory in a single- product manufacturing system ⋮ Integrated procurement-production systems: A review ⋮ A due date-based approach to part type selection in flexible manufacturing systems ⋮ Parallel machine scheduling considering a job-splitting property ⋮ Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint ⋮ On the global optimal solution to an integrated inventory system with general time varying demand, production and deterioration rates ⋮ Bottleneck-focused scheduling for a hybrid flowshop ⋮ Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop
Cites Work
This page was built for publication: An integrated inventory model for a single product and its raw materials