| Publication | Date of Publication | Type |
|---|
| Coordination of manufacturing and engineering activities during product transitions | 2023-10-20 | Paper |
| Constraint violation reduction search for 0–1 mixed integer linear programming problems | 2023-10-10 | Paper |
| Managing Product Transitions: A Bilevel Programming Approach | 2022-12-01 | Paper |
| Integrated and hierarchical systems for coordinating order acceptance and release planning | 2022-08-03 | Paper |
| Conic programming models for production planning with clearing functions: formulations and duality | 2021-06-07 | Paper |
| Valid inequalities for concave piecewise linear regression | 2020-02-10 | Paper |
| Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior | 2018-09-18 | Paper |
| Robust optimization approaches for the equitable and effective distribution of donated food | 2018-05-22 | Paper |
| A genetic algorithm for a single product network design model with lead time and safety stock considerations | 2009-04-30 | Paper |
| Production planning with resources subject to congestion | 2009-04-22 | Paper |
| Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study | 2009-02-24 | Paper |
| Heuristics for capacity planning problems with congestion | 2009-02-12 | Paper |
| Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions | 2008-09-03 | Paper |
| Learning effective dispatching rules for batch processor scheduling | 2008-05-06 | Paper |
| Outbound supply chain network design with mode selection and lead time considerations | 2008-01-09 | Paper |
| Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times | 2007-11-30 | Paper |
| Short-term capacity allocation problem with tool and setup constraints | 2007-05-24 | Paper |
| Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication | 2007-05-15 | Paper |
| Rapid modeling and discovery of priority dispatching rules: An autonomous learning approach | 2007-05-15 | Paper |
| A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families | 2007-04-26 | Paper |
| A computational study of shifting bottleneck procedures for shop scheduling problems | 2005-10-13 | Paper |
| Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers | 2005-05-12 | Paper |
| Executing production schedules in the face of uncertainties: a review and some future directions | 2004-11-22 | Paper |
| Experimental evaluation of heuristic optimization algorithms: A tutorial | 2001-11-19 | Paper |
| Integrating interval estimates of global optima and local search methods for combinatorial optimization problems | 2001-11-19 | Paper |
| Decomposition methods for reentrant flow shops with sequence-dependent setup times | 2001-08-05 | Paper |
| Control of a batch-processing machine: A computational approach | 2000-10-25 | Paper |
| Performance of decomposition procedures for job shop scheduling problems with bottleneck machines | 2000-08-22 | Paper |
| Predictable scheduling of a single machine with breakdowns and sensitive jobs | 2000-08-21 | Paper |
| Benchmarks for shop scheduling problems | 1999-08-02 | Paper |
| A capacity allocation problem with integer side constraints | 1999-08-02 | Paper |
| Media streams scheduling for synchronization in distributed multimedia systems | 1999-06-20 | Paper |
| Minimizing makespan on a single batch processing machine with dynamic job arrivals | 1999-06-08 | Paper |
| Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times | 1999-04-20 | Paper |
| Scheduling batch processing machines with incompatible job families | 1999-03-30 | Paper |
| Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times | 1998-06-11 | Paper |
| Scheduling a single batch processing machine with non-identical job sizes | 1998-06-11 | Paper |
| Rescheduling on a single machine with part-type dependent setup times and deadlines | 1997-12-04 | Paper |
| Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates | 1997-12-04 | Paper |
| Machine Criticality Measures and Subproblem Solution Procedures in Shifting Bottleneck Methods: A Computational Study | 1997-01-29 | Paper |
| Single-machine scheduling with dynamic arrivals: Decomposition results and an improved algorithm | 1997-01-21 | Paper |
| An iterative heuristic for the single machine dynamic total completion time scheduling problem | 1996-10-30 | Paper |
| A robust strategy approach to a strategic mobility problem | 1995-01-11 | Paper |
| Worst-case error bounds for parallel machine scheduling problems with bounded sequence-dependent setup times | 1994-04-06 | Paper |
| Minimizing total completion time on a batch processing machine with job families | 1993-08-10 | Paper |
| Efficient Algorithms for Scheduling Semiconductor Burn-In Operations | 1993-01-17 | Paper |
| A new dynamic programming algorithm for the parallel machines total weighted completion time problem | 1993-01-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3989986 | 1992-06-28 | Paper |