Jason Chao-Hsien Pan

From MaRDI portal
(Redirected from Person:207227)



List of research outcomes

This list is not complete and representing at the moment only items from zbMATH Open and arXiv. We are working on additional sources - please check back here soon!

PublicationDate of PublicationType
A travel time estimation model for a high-level picker-to-part system with class-based storage policies
European Journal of Operational Research
2016-06-23Paper
Two parallel machines problem with job delivery coordination and availability constraint
Annals of Operations Research
2016-03-09Paper
Optimal inventory policies for serial-type and assembly-type supply chains with equal sized batch
Journal of Industrial and Management Optimization
2015-02-03Paper
Throughput analysis for order picking system with multiple pickers and Aisle congestion considerations
Computers & Operations Research
2012-11-15Paper
Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments
Journal of Optimization Theory and Applications
2012-06-26Paper
An integrated inventory model with ordering cost and setup cost reductions under just-in-time purchasing
Journal of Information and Optimization Sciences
2011-06-22Paper
Implementing virtual metrology for in-line quality control in semiconductor manufacturing
International Journal of Systems Science. Principles and Applications of Systems and Integration
2009-10-21Paper
A new heuristic algorithm for the machine scheduling problem with job delivery coordination
Theoretical Computer Science
2009-07-10Paper
THE LEARNING EFFECT ON SETUP COST REDUCTION FOR MIXTURE INVENTORY MODELS WITH VARIABLE LEAD TIME
Asia-Pacific Journal of Operational Research
2008-10-17Paper
A storage strategy for paperless order picking systems by multi-picker
Journal of Statistics and Management Systems
2008-04-03Paper
Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain
International Journal of Production Research
2008-02-25Paper
Mixture inventory model in fuzzy demand with controllable lead time
Journal of Statistics and Management Systems
2007-10-31Paper
Minimising mean tardiness with alternative operations in two-machine flow-shop scheduling
International Journal of Systems Science. Principles and Applications of Systems and Integration
2005-12-22Paper
Mixed binary integer programming formulations for the reentrant job shop scheduling problem
Computers & Operations Research
2005-08-03Paper
Minimizing makespan in re-entrant permutation flow-shops
The Journal of the Operational Research Society
2005-04-04Paper
Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment
International Journal of Production Research
2004-10-28Paper
Optimal reorder point inventory models with variable lead time and backorder discount considerations
European Journal of Operational Research
2004-08-16Paper
A study of an integrated inventory with controllable lead time
International Journal of Production Research
2004-01-14Paper
Inventory models with back-order discounts and variable lead time
International Journal of Systems Science. Principles and Applications of Systems and Integration
2002-11-06Paper
A heuristic approach for single-machine scheduling with due dates and class setups.
Computers & Operations Research
2002-10-31Paper
Minimizing tardiness in a two-machine flow-shop
Computers & Operations Research
2002-04-03Paper
Two-machine flowshop scheduling to minimize total tardiness
International Journal of Systems Science. Principles and Applications of Systems and Integration
1997-09-04Paper


Research outcomes over time


This page was built for person: Jason Chao-Hsien Pan