Minimizing makespan in re-entrant permutation flow-shops
From MaRDI portal
Recommendations
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Minimizing makespan on a two-machine re-entrant flowshop
- Heuristic algorithms for two machine re-entrant flow shop
- Minimizing total completion time for re-entrant flow shop scheduling problems
- Flow shops with reentry: reversibility properties and makespan optimal schedules
Cited in
(16)- Minimizing total tardiness on a two-machine re-entrant flowshop
- Re-entrant flowshop scheduling with learning considerations to minimize the makespan
- Flow shops with reentry: reversibility properties and makespan optimal schedules
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- Multi-family scheduling in a two-machine reentrant flow shop with setups
- Mixed binary integer programming formulations for the reentrant job shop scheduling problem
- An iterated local search for a re-entrant flow shop scheduling problem
- Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
- Mean Flow Time Minimization in Reentrant Job Shops with a Hub
- Minimizing makespan on a two-machine re-entrant flowshop
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
- Minimizing total completion time for re-entrant flow shop scheduling problems
- Makespan minimization in reentrant flow shop problem with identical jobs
- Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type distributions
- Flow shops with reentry: the total weighted completion time objective
- Heuristic algorithms for two machine re-entrant flow shop
This page was built for publication: Minimizing makespan in re-entrant permutation flow-shops
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4661115)