Heuristic algorithms for two machine re-entrant flow shop
From MaRDI portal
Recommendations
- A heuristic algorithm for two-machine re-entrant shop scheduling
- Heuristic algorithms for the two-stage hybrid flowshop problem
- Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
- A heuristic method for two-stage hybrid flow shop with dedicated machines
- Heuristics for two-machine flowshop scheduling with setup times and an availability constraint
- Heuristic algorithms for continuous flow-shop problem
- Heuristics for two-machine no-wait flowshop scheduling with an availability constraint
- Minimizing makespan on a two-machine re-entrant flowshop
- A heuristic search algorithm for flow-shop scheduling
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
Cites work
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- A heuristic algorithm for two-machine re-entrant shop scheduling
- Batching and Scheduling in FMS Hubs: Flow Time Considerations
- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- Minimizing Makespan in a Class of Reentrant Shops
- Minimizing makespan in re-entrant permutation flow-shops
- Minimizing makespan on a two-machine re-entrant flowshop
Cited in
(12)- Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem
- Multi-family scheduling in a two-machine reentrant flow shop with setups
- Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment
- Minimizing total tardiness on a two-machine re-entrant flowshop
- A New Bottleneck-Based Heuristic for Reentrant Job Shops: A Case Study in a Textile Factory
- Scheduling reentrant jobs on parallel machines with a remote server
- Re-entrant flowshop scheduling with learning considerations to minimize the makespan
- Minimizing total completion time for re-entrant flow shop scheduling problems
- Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
- Minimizing makespan in re-entrant permutation flow-shops
- An iterated local search for a re-entrant flow shop scheduling problem
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
This page was built for publication: Heuristic algorithms for two machine re-entrant flow shop
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q930923)