Gaurav Singh

From MaRDI portal
Person:217038

Available identifiers

zbMath Open singh.gauravMaRDI QIDQ217038

List of research outcomes





PublicationDate of PublicationType
The inapplicability of variational methods in the cohesive crack problem for initially rigid traction‐separation relation and its solution using integral equations2024-01-04Paper
On the uniqueness of continuous positive solution for a non-linear integral equation whose singularity lies in the reciprocal of the solution2023-11-13Paper
Flexible flow shop with dedicated buffers2019-05-17Paper
Exact approaches for the orderly colored longest path problem: performance comparison2018-12-03Paper
Mathematical models for the berth allocation problem in dry bulk terminals2018-04-04Paper
An integrated model for the transshipment yard scheduling problem2018-04-03Paper
Decentralised scheduling with confidentiality protection2018-02-06Paper
Modeling and analysis of the effects of antivirus software on an infected computer network2017-06-08Paper
Parallel ant colony optimization for resource constrained job scheduling2016-10-11Paper
Rail schedule optimisation in the hunter valley coal chain2015-04-27Paper
Approximate Distance Oracle in O(n2) Time and O(n) Space for Chordal Graphs2015-02-27Paper
A resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain example2015-02-03Paper
Discrete optimization with polynomially detectable boundaries and restricted level sets2013-03-25Paper
A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain2012-12-29Paper
Resource constraint scheduling with a fractional shared resource2012-04-05Paper
Taming wind energy with battery storage2011-04-07Paper
Scheduling UET-UCT tasks: Branch-and-bound search in the priority space2011-02-03Paper
Discrete Optimization with Polynomially Detectable Boundaries and Restricted Level Sets2011-01-08Paper
Performance of critical path type algorithms with communication delay2008-08-12Paper
PREEMPTIVE SCHEDULING ON PARALLEL PROCESSORS WITH DUE DATES2006-01-09Paper
Scheduling UET-UCT outforests to minimize maximum lateness2005-04-21Paper
Scheduling with precedence constraints: Worst-case analysis of priority algorithms2003-12-08Paper
https://portal.mardi4nfdi.de/entity/Q45462392002-08-19Paper
Performance of critical path type algorithms for scheduling on parallel processors2001-12-05Paper

Research outcomes over time

This page was built for person: Gaurav Singh