Binghai Zhou

From MaRDI portal
Person:2171090

Available identifiers

zbMath Open zhou.binghaiMaRDI QIDQ2171090

List of research outcomes





PublicationDate of PublicationType
Lagrangian relaxation algorithm for the truck scheduling problem with products time window constraint in multi-door cross-dock2022-09-23Paper
Improved multi-objective cuckoo search algorithm for part feeding scheduling of automotive assembly lines2021-07-01Paper
Dynamic scheduling of material delivery based on neural network and knowledge base2020-10-27Paper
Lagrangian relaxation algorithm for cross-dock scheduling \& problems in cold-chain logistics2020-10-27Paper
Multi-objective scheduling method for workshop cranes based on projection model of trajectories2019-10-02Paper
An optimization method for a single machine multi-family scheduling problem with qualification run constraints2018-10-22Paper
Production system maintenance decision models based on product quality and rework process2018-07-18Paper
https://portal.mardi4nfdi.de/entity/Q31754532018-07-18Paper
Optimization of buffer allocation in unreliable production lines based on availability evaluation2018-05-31Paper
Optimal method of robotic assemble line balancing considering changeover time2018-05-25Paper
https://portal.mardi4nfdi.de/entity/Q31312782018-01-29Paper
Hybrid heuristic algorithm for integrated scheduling in flexible job shops2017-01-06Paper
https://portal.mardi4nfdi.de/entity/Q29512552017-01-06Paper
Scheduling multiple orders per job with various constraints for hybrid flow shop2017-01-06Paper
The scheduling and performance analysis of cluster tools with buffers based on branch searching2016-10-06Paper
Lagrangian relaxation algorithm for scheduling problems of reentrant hybrid flow shops2016-08-10Paper
https://portal.mardi4nfdi.de/entity/Q29930282016-08-10Paper
Robust scheduling method for resource-constrained operation rooms with uncertain processing time2016-08-10Paper
Disjunctive graph-based scheduling algorithm for job shop with material handling2016-08-10Paper
Optimal order-replacement policy for a deteriorating system based on delayed geometric process2016-01-15Paper
Scheduling of bottleneck workstation in wafer fabrication systems based on an improved multi-objective particle swarm optimization algorithm2014-11-03Paper
Algorithm of the finish time of jobs based on flexible scheduling with an objective of JIT2010-07-08Paper
A filtered-beam-search based approach for FMS dynamic scheduling2009-03-06Paper
https://portal.mardi4nfdi.de/entity/Q36099782009-03-06Paper
A filtered-beam-search-based heuristic algorithm for flexible job-shop scheduling problem2008-05-19Paper

Research outcomes over time

This page was built for person: Binghai Zhou