scientific article; zbMATH DE number 6830871
From MaRDI portal
Publication:3131278
Recommendations
- Scheduling just-in-time part supply for mixed-model assembly lines
- Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Just-in-time sequencing algorithms for mixed-model production systems
- Scheduling the replenishment of just-in-time supermarkets in assembly plants
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Revisiting the mixed-model multi-level just-in-time scheduling problem
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Balancing and scheduling of flexible mixed model assembly lines
Cited in
(7)- Scheduling just-in-time transport vehicles to feed parts for mixed model assembly lines
- Scheduling just-in-time part supply for mixed-model assembly lines
- Material allocation in MRP with tardiness penalties
- Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line
- A kanban-based simulation study of a mixed model just-in-time manufacturing line
- Integrated modeling of material delivery and container pickup problem for aircraft moving assembly line
- Joint replenishment meets scheduling
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3131278)