A kanban-based simulation study of a mixed model just-in-time manufacturing line
From MaRDI portal
Publication:4398958
Recommendations
- Modelling the performance of a kanban assembly shop
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
- Flexible kanbans to enhance volume flexibility in a JIT environment: a simulation based comparison via anns
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- scientific article; zbMATH DE number 6830871
- Scheduling just-in-time part supply for mixed-model assembly lines
- A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
- A simple lot-scheduling model for just-in-time manufacturing
Cites work
Cited in
(6)- A hybrid GA-simulation approach to improve JIT systems
- Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study
- A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
- A simulation generator for dual-card kanban-controlled flow shops
- An overview of design and operational issues of kanban systems
- Analysis of decentralized multi‐product pull systems with lost sales
This page was built for publication: A kanban-based simulation study of a mixed model just-in-time manufacturing line
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4398958)