Notice: Unexpected clearActionName after getActionName already called in /var/www/html/includes/context/RequestContext.php on line 338
Jean Marie Proth - MaRDI portal

Jean Marie Proth

From MaRDI portal
(Redirected from Person:227842)
Person:1079483

Available identifiers

zbMath Open proth.jean-marieWikidataQ33133287 ScholiaQ33133287MaRDI QIDQ1079483

List of research outcomes

PublicationDate of PublicationType
On-Line Scheduling In Assembly Processes2023-04-24Paper
Minimizing the number of machines for minimum length schedules2009-12-07Paper
Opportunistic supply chain formation from qualified partners for a new market demand2009-10-15Paper
Optimisation of multi-position machines and transfer lines2007-12-10Paper
Scheduling in supply chain environment2007-08-27Paper
Single machine scheduling and due date assignment under series-parallel precedence constraints2006-06-12Paper
Strategic capacity planning in supply chain design for a new market opportunity2005-04-26Paper
https://portal.mardi4nfdi.de/entity/Q46670872005-04-19Paper
https://portal.mardi4nfdi.de/entity/Q31592242005-02-15Paper
Insertion of a random task in a schedule: a real-time approach2005-02-09Paper
Insertion of a random bitask in a schedule: a real-time approach2004-06-15Paper
The concave cost supply problem.2003-06-09Paper
Multifunction radar: Task scheduling2003-04-27Paper
Computation of pair placement of geometric objects2002-09-13Paper
A survey of the state-of-the-art of common due date assignment and scheduling research2002-06-16Paper
Marking optimization of stochastic timed event graphs using IPA2001-06-25Paper
Improving job-shop schedules through critical pairwise exchanges2001-01-02Paper
Heuristics for unrelated machine scheduling with precedence constraints2000-12-17Paper
Prediction of average queue length in manufacturing resources at the time of new lot arrival2000-11-01Paper
Electric vehicles: effect of the availability threshold on the transportation cost2000-11-01Paper
On-line scheduling in a surface treatment system2000-03-19Paper
The simple and multiple job assignment problems2000-01-01Paper
The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming1999-08-02Paper
A dual ascent approach to the fixed-charge capacitated network design problem1999-02-22Paper
Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems1999-02-22Paper
Heuristic procedures for minimizing makespan and the number of required pallets1998-07-14Paper
Finite capacity flow control in a multi-stage/multi-product environment1998-06-11Paper
https://portal.mardi4nfdi.de/entity/Q43568881997-10-05Paper
https://portal.mardi4nfdi.de/entity/Q43326951997-02-13Paper
Production management in a Petri net environment1996-10-24Paper
https://portal.mardi4nfdi.de/entity/Q47636011996-03-18Paper
https://portal.mardi4nfdi.de/entity/Q47636141996-03-18Paper
Cycle time of stochastic event graphs: evaluation and marking optimization1994-09-25Paper
A comprehensive approach of planning and scheduling based on petri nets1994-09-08Paper
Some open problems in the design and use of modern production systems1994-07-04Paper
Supply management in assembly systems1994-04-19Paper
https://portal.mardi4nfdi.de/entity/Q40166741993-01-16Paper
Optimisation of invariant criteria for event graphs1992-09-27Paper
https://portal.mardi4nfdi.de/entity/Q40014881992-09-18Paper
https://portal.mardi4nfdi.de/entity/Q39877871992-06-28Paper
CLASS: Computerized LAyout Solutions using Simulated annealing1992-06-28Paper
https://portal.mardi4nfdi.de/entity/Q39857211992-06-27Paper
A demand-to-manufacturing-requirement model based on predefined configurations1992-06-26Paper
Simulation studies in JIT production1992-01-01Paper
https://portal.mardi4nfdi.de/entity/Q52020201991-01-01Paper
Fast evaluation of an unreliable transfer line with limited transportation devices1990-01-01Paper
Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models1990-01-01Paper
Performance evaluation of job-shop systems using timed event-graphs1989-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37807351988-01-01Paper
Analyse de fabrications non linéaires et répétitives à l'aide de graphes d'événements temporisés1988-01-01Paper
Study Of A Closed Loop Conveyor System1987-01-01Paper
A top-down hierarchical classification method1987-01-01Paper
Quasi-linear production systems: Optimization of the transportation system1986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37277241986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37303161986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q37513611986-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36774641985-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36913801985-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36968441985-01-01Paper
Group technology in production management: The short horizon planning level1985-01-01Paper
Inventory planning in a deterministic environment: Continuous time model with concave costs1984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32171831984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q32203311984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33309331984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33327221984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33355101984-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36789421983-01-01Paper
https://portal.mardi4nfdi.de/entity/Q33371791982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q36594921982-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39147211981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q39518931981-01-01Paper
https://portal.mardi4nfdi.de/entity/Q56636291973-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Jean Marie Proth