Shisheng Li

From MaRDI portal
Person:326476

Available identifiers

zbMath Open li.shishengMaRDI QIDQ326476

List of research outcomes





PublicationDate of PublicationType
Competitive two-agent scheduling with release dates and preemption on a single machine2023-07-13Paper
Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs2022-12-23Paper
Multitasking scheduling problems with two competitive agents2022-12-23Paper
Minimizing total weighted late work on a single-machine with non-availability intervals2022-08-19Paper
https://portal.mardi4nfdi.de/entity/Q50172752021-12-17Paper
Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs2021-11-26Paper
Minimizing maximum delivery completion time for order scheduling with rejection2021-05-10Paper
https://portal.mardi4nfdi.de/entity/Q49840232021-04-26Paper
Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties2021-02-17Paper
Single-machine scheduling with multi-agents to minimize total weighted late work2020-08-31Paper
Two-agent scheduling with rejection on a single machine2019-11-20Paper
Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection2019-10-29Paper
Two-agent single-machine scheduling with cumulative deterioration2019-07-02Paper
Online Parallel-Machine Scheduling in KRT Environment to Minimize Total Weighted Completion Time2018-10-16Paper
https://portal.mardi4nfdi.de/entity/Q31757162018-07-18Paper
Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs2018-06-14Paper
Online batch scheduling with kind release times and incompatible families to minimize makespan2018-04-19Paper
An optimal online algorithm for the parallel-batch scheduling with job processing time compatibilities2017-11-09Paper
Proportionate Flow Shop Scheduling with Rejection2017-09-22Paper
Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine2017-08-10Paper
Scheduling two job families on a single machine with two competitive agents2016-10-12Paper
https://portal.mardi4nfdi.de/entity/Q29917722016-08-10Paper
New results on two-machine flow-shop scheduling with rejection2016-05-11Paper
Two-agent single machine scheduling with forbidden intervals2016-01-15Paper
Online batch scheduling of equal-length jobs on two identical batch machines to maximise the number of early jobs2015-07-28Paper
https://portal.mardi4nfdi.de/entity/Q52606732015-06-29Paper
Group Scheduling with Two Competing Agents on a Single Machine2015-02-17Paper
https://portal.mardi4nfdi.de/entity/Q51715982015-02-11Paper
Scheduling a bounded parallel-batching machine with incompatible job families and rejection2015-01-27Paper
A note on reverse scheduling with maximum lateness objective2014-08-18Paper
Unbounded parallel-batching scheduling with two competitive agents2014-02-05Paper
Bounded parallel-batching scheduling with two competing agents2014-02-05Paper
Unbounded parallel-batch scheduling with family jobs and delivery coordination2013-03-28Paper
Single-machine scheduling with proportionally deteriorating jobs subject to availability constraints2012-10-16Paper
Bi-criteria scheduling on a single parallel-batch machine2012-07-20Paper
SCHEDULING PROPORTIONALLY DETERIORATING JOBS IN TWO-MACHINE OPEN SHOP WITH A NON-BOTTLENECK MACHINE2011-12-08Paper
Study on deformation prediction of landslide based on genetic algorithm and improved BP neural network2011-07-28Paper
Scheduling resumable deteriorating jobs on a single machine with non-availability constraints2011-02-02Paper
Parallel-machine scheduling with deteriorating jobs and rejection2010-10-11Paper
Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan2010-03-09Paper
Improved algorithm for finding next-to-shortest paths2010-01-29Paper
Scheduling with families of jobs and delivery coordination under job availability2009-11-06Paper
A best on-line algorithm for the single machine parallel-batch scheduling with restricted delivery times2009-09-18Paper
A decision support system for materials requirements planning lot-sizing1990-01-01Paper
Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem1989-01-01Paper

Research outcomes over time

This page was built for person: Shisheng Li