Publication | Date of Publication | Type |
---|
Competitive two-agent scheduling with release dates and preemption on a single machine | 2023-07-13 | Paper |
Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs | 2022-12-23 | Paper |
Multitasking scheduling problems with two competitive agents | 2022-12-23 | Paper |
Minimizing total weighted late work on a single-machine with non-availability intervals | 2022-08-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q5017275 | 2021-12-17 | Paper |
Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs | 2021-11-26 | Paper |
Minimizing maximum delivery completion time for order scheduling with rejection | 2021-05-10 | Paper |
https://portal.mardi4nfdi.de/entity/Q4984023 | 2021-04-26 | Paper |
Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties | 2021-02-17 | Paper |
Single-machine scheduling with multi-agents to minimize total weighted late work | 2020-08-31 | Paper |
Two-agent scheduling with rejection on a single machine | 2019-11-20 | Paper |
Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection | 2019-10-29 | Paper |
Two-agent single-machine scheduling with cumulative deterioration | 2019-07-02 | Paper |
Online Parallel-Machine Scheduling in KRT Environment to Minimize Total Weighted Completion Time | 2018-10-16 | Paper |
https://portal.mardi4nfdi.de/entity/Q3175716 | 2018-07-18 | Paper |
Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs | 2018-06-14 | Paper |
Online batch scheduling with kind release times and incompatible families to minimize makespan | 2018-04-19 | Paper |
An optimal online algorithm for the parallel-batch scheduling with job processing time compatibilities | 2017-11-09 | Paper |
Proportionate Flow Shop Scheduling with Rejection | 2017-09-22 | Paper |
Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine | 2017-08-10 | Paper |
Scheduling two job families on a single machine with two competitive agents | 2016-10-12 | Paper |
https://portal.mardi4nfdi.de/entity/Q2991772 | 2016-08-10 | Paper |
New results on two-machine flow-shop scheduling with rejection | 2016-05-11 | Paper |
Two-agent single machine scheduling with forbidden intervals | 2016-01-15 | Paper |
Online batch scheduling of equal-length jobs on two identical batch machines to maximise the number of early jobs | 2015-07-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q5260673 | 2015-06-29 | Paper |
Group Scheduling with Two Competing Agents on a Single Machine | 2015-02-17 | Paper |
https://portal.mardi4nfdi.de/entity/Q5171598 | 2015-02-11 | Paper |
Scheduling a bounded parallel-batching machine with incompatible job families and rejection | 2015-01-27 | Paper |
Unbounded parallel-batching scheduling with two competitive agents | 2014-02-05 | Paper |
Bounded parallel-batching scheduling with two competing agents | 2014-02-05 | Paper |
Unbounded parallel-batch scheduling with family jobs and delivery coordination | 2013-03-28 | Paper |
SINGLE-MACHINE SCHEDULING WITH PROPORTIONALLY DETERIORATING JOBS SUBJECT TO AVAILABILITY CONSTRAINTS | 2012-10-16 | Paper |
Bi-criteria scheduling on a single parallel-batch machine | 2012-07-20 | Paper |
SCHEDULING PROPORTIONALLY DETERIORATING JOBS IN TWO-MACHINE OPEN SHOP WITH A NON-BOTTLENECK MACHINE | 2011-12-08 | Paper |
Study on deformation prediction of landslide based on genetic algorithm and improved BP neural network | 2011-07-28 | Paper |
Scheduling resumable deteriorating jobs on a single machine with non-availability constraints | 2011-02-02 | Paper |
Parallel-machine scheduling with deteriorating jobs and rejection | 2010-10-11 | Paper |
Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan | 2010-03-09 | Paper |
Improved algorithm for finding next-to-shortest paths | 2010-01-29 | Paper |
Scheduling with families of jobs and delivery coordination under job availability | 2009-11-06 | Paper |
A best on-line algorithm for the single machine parallel-batch scheduling with restricted delivery times | 2009-09-18 | Paper |
A decision support system for materials requirements planning lot-sizing | 1990-01-01 | Paper |
Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem | 1989-01-01 | Paper |