Shi-Sheng Li

From MaRDI portal
Person:326476

Available identifiers

zbMath Open li.shishengMaRDI QIDQ326476

List of research outcomes

PublicationDate of PublicationType
Competitive two-agent scheduling with release dates and preemption on a single machine2023-07-13Paper
Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs2022-12-23Paper
Multitasking scheduling problems with two competitive agents2022-12-23Paper
Minimizing total weighted late work on a single-machine with non-availability intervals2022-08-19Paper
https://portal.mardi4nfdi.de/entity/Q50172752021-12-17Paper
Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs2021-11-26Paper
Minimizing maximum delivery completion time for order scheduling with rejection2021-05-10Paper
https://portal.mardi4nfdi.de/entity/Q49840232021-04-26Paper
Scheduling with common due date assignment to minimize generalized weighted earliness-tardiness penalties2021-02-17Paper
Single-machine scheduling with multi-agents to minimize total weighted late work2020-08-31Paper
Two-agent scheduling with rejection on a single machine2019-11-20Paper
Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection2019-10-29Paper
Two-agent single-machine scheduling with cumulative deterioration2019-07-02Paper
Online Parallel-Machine Scheduling in KRT Environment to Minimize Total Weighted Completion Time2018-10-16Paper
https://portal.mardi4nfdi.de/entity/Q31757162018-07-18Paper
Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs2018-06-14Paper
Online batch scheduling with kind release times and incompatible families to minimize makespan2018-04-19Paper
An optimal online algorithm for the parallel-batch scheduling with job processing time compatibilities2017-11-09Paper
Proportionate Flow Shop Scheduling with Rejection2017-09-22Paper
Scheduling with Rejection and a Deteriorating Maintenance Activity on a Single Machine2017-08-10Paper
Scheduling two job families on a single machine with two competitive agents2016-10-12Paper
https://portal.mardi4nfdi.de/entity/Q29917722016-08-10Paper
New results on two-machine flow-shop scheduling with rejection2016-05-11Paper
Two-agent single machine scheduling with forbidden intervals2016-01-15Paper
Online batch scheduling of equal-length jobs on two identical batch machines to maximise the number of early jobs2015-07-28Paper
https://portal.mardi4nfdi.de/entity/Q52606732015-06-29Paper
Group Scheduling with Two Competing Agents on a Single Machine2015-02-17Paper
https://portal.mardi4nfdi.de/entity/Q51715982015-02-11Paper
Scheduling a bounded parallel-batching machine with incompatible job families and rejection2015-01-27Paper
Unbounded parallel-batching scheduling with two competitive agents2014-02-05Paper
Bounded parallel-batching scheduling with two competing agents2014-02-05Paper
Unbounded parallel-batch scheduling with family jobs and delivery coordination2013-03-28Paper
SINGLE-MACHINE SCHEDULING WITH PROPORTIONALLY DETERIORATING JOBS SUBJECT TO AVAILABILITY CONSTRAINTS2012-10-16Paper
Bi-criteria scheduling on a single parallel-batch machine2012-07-20Paper
SCHEDULING PROPORTIONALLY DETERIORATING JOBS IN TWO-MACHINE OPEN SHOP WITH A NON-BOTTLENECK MACHINE2011-12-08Paper
Study on deformation prediction of landslide based on genetic algorithm and improved BP neural network2011-07-28Paper
Scheduling resumable deteriorating jobs on a single machine with non-availability constraints2011-02-02Paper
Parallel-machine scheduling with deteriorating jobs and rejection2010-10-11Paper
Parallel-machine parallel-batching scheduling with family jobs and release dates to minimize makespan2010-03-09Paper
Improved algorithm for finding next-to-shortest paths2010-01-29Paper
Scheduling with families of jobs and delivery coordination under job availability2009-11-06Paper
A best on-line algorithm for the single machine parallel-batch scheduling with restricted delivery times2009-09-18Paper
A decision support system for materials requirements planning lot-sizing1990-01-01Paper
Some observations and extensions of the optimal TWK-power due-date determination and sequencing problem1989-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Shi-Sheng Li