Kenneth R. Baker

From MaRDI portal
Person:336771

Available identifiers

zbMath Open baker.kenneth-rMaRDI QIDQ336771

List of research outcomes





PublicationDate of PublicationType
Minimizing flowtime for paired tasks2018-05-25Paper
Setting optimal due dates in a basic safe-scheduling model2016-11-10Paper
Minimizing earliness and tardiness costs in stochastic scheduling2015-07-29Paper
Trading off due-date tightness and job tardiness in a basic scheduling model2015-07-28Paper
An Optimal Contact Model for Maximizing Online Panel Response Rates2012-03-01Paper
Minimizing the number of tardy jobs with stochastically-ordered processing times2009-08-28Paper
Principles of Sequencing and Scheduling2009-06-15Paper
Safe scheduling: Setting due dates in single-machine problems2009-01-08Paper
A multiple-criterion model for machine scheduling2007-12-20Paper
https://portal.mardi4nfdi.de/entity/Q46566402005-03-14Paper
Optimal block design models for course timetabling2002-08-28Paper
On the WMC density as an inverse Gaussian probability density2001-07-18Paper
Minimizing maximum lateness with job families2000-12-21Paper
Lower bounds and algorithms for flowtime minimization on a single machine with set-up times2000-09-19Paper
https://portal.mardi4nfdi.de/entity/Q49435622000-03-16Paper
A predictive model for the throughput of simple assembly systems1998-08-16Paper
Scheduling Groups of Jobs on a Single Machine1996-10-27Paper
Lot streaming in the two-machine flow shop with setup times1995-08-27Paper
Basic Techniques for Lot Streaming1994-03-13Paper
Sequencing with Earliness and Tardiness Penalties: A Review1990-01-01Paper
On the Assignment of Optimal Due Dates1989-01-01Paper
A bicriterion approach to time/cost trade-offs in sequencing1982-01-01Paper
An analysis of terminal conditions in rolling schedules1981-01-01Paper
Sequencing independent jobs with a single resource1980-01-01Paper
An Analytic Framework for Evaluating Rolling Schedules1979-01-01Paper
Dynamic Programming Solution of Sequencing Problems with Precedence Constraints1978-01-01Paper
An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints1978-01-01Paper
Finding an Optimal Sequence by Dynamic Programming: An Extension to Precedence-Related Tasks1978-01-01Paper
Workforce Scheduling with Cyclic Demands and Day-Off Constraints1977-01-01Paper
A Comparative Study of Flow-Shop Algorithms1975-01-01Paper
Technical Note—An Elimination Method for the Flow-Shop Problem1975-01-01Paper
Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements1974-01-01Paper
Sequencing with due-dates and early start times to minimize maximum tardiness1974-01-01Paper
An experimental comparison of solution algorithms for the single-machine tardiness problem1974-01-01Paper
Scheduling Full-Time and Part-Time Staff to Meet Cyclic Requirements1974-01-01Paper
A Note On Operating Policies For The Queue M/M/1 With Exponential Startups1973-01-01Paper
Scheduling with parallel processors and linear delay costs1973-01-01Paper
https://portal.mardi4nfdi.de/entity/Q47668011973-01-01Paper

Research outcomes over time

This page was built for person: Kenneth R. Baker