Publication | Date of Publication | Type |
---|
On-Line Scheduling In Assembly Processes | 2023-04-24 | Paper |
Minimizing the number of machines for minimum length schedules | 2009-12-07 | Paper |
Opportunistic supply chain formation from qualified partners for a new market demand | 2009-10-15 | Paper |
Optimisation of multi-position machines and transfer lines | 2007-12-10 | Paper |
Scheduling in supply chain environment | 2007-08-27 | Paper |
Single machine scheduling and due date assignment under series-parallel precedence constraints | 2006-06-12 | Paper |
Strategic capacity planning in supply chain design for a new market opportunity | 2005-04-26 | Paper |
https://portal.mardi4nfdi.de/entity/Q4667087 | 2005-04-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q3159224 | 2005-02-15 | Paper |
Insertion of a random task in a schedule: a real-time approach | 2005-02-09 | Paper |
Insertion of a random bitask in a schedule: a real-time approach | 2004-06-15 | Paper |
The concave cost supply problem. | 2003-06-09 | Paper |
Multifunction radar: Task scheduling | 2003-04-27 | Paper |
Computation of pair placement of geometric objects | 2002-09-13 | Paper |
A survey of the state-of-the-art of common due date assignment and scheduling research | 2002-06-16 | Paper |
Marking optimization of stochastic timed event graphs using IPA | 2001-06-25 | Paper |
Improving job-shop schedules through critical pairwise exchanges | 2001-01-02 | Paper |
Heuristics for unrelated machine scheduling with precedence constraints | 2000-12-17 | Paper |
Prediction of average queue length in manufacturing resources at the time of new lot arrival | 2000-11-01 | Paper |
Electric vehicles: effect of the availability threshold on the transportation cost | 2000-11-01 | Paper |
On-line scheduling in a surface treatment system | 2000-03-19 | Paper |
The simple and multiple job assignment problems | 2000-01-01 | Paper |
The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming | 1999-08-02 | Paper |
A dual ascent approach to the fixed-charge capacitated network design problem | 1999-02-22 | Paper |
Heuristic approaches for \(n/m/F/\sum C_i\) scheduling problems | 1999-02-22 | Paper |
Heuristic procedures for minimizing makespan and the number of required pallets | 1998-07-14 | Paper |
Finite capacity flow control in a multi-stage/multi-product environment | 1998-06-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q4356888 | 1997-10-05 | Paper |
https://portal.mardi4nfdi.de/entity/Q4332695 | 1997-02-13 | Paper |
Production management in a Petri net environment | 1996-10-24 | Paper |
https://portal.mardi4nfdi.de/entity/Q4763601 | 1996-03-18 | Paper |
https://portal.mardi4nfdi.de/entity/Q4763614 | 1996-03-18 | Paper |
Cycle time of stochastic event graphs: evaluation and marking optimization | 1994-09-25 | Paper |
A comprehensive approach of planning and scheduling based on petri nets | 1994-09-08 | Paper |
Some open problems in the design and use of modern production systems | 1994-07-04 | Paper |
Supply management in assembly systems | 1994-04-19 | Paper |
https://portal.mardi4nfdi.de/entity/Q4016674 | 1993-01-16 | Paper |
Optimisation of invariant criteria for event graphs | 1992-09-27 | Paper |
https://portal.mardi4nfdi.de/entity/Q4001488 | 1992-09-18 | Paper |
https://portal.mardi4nfdi.de/entity/Q3987787 | 1992-06-28 | Paper |
CLASS: Computerized LAyout Solutions using Simulated annealing | 1992-06-28 | Paper |
https://portal.mardi4nfdi.de/entity/Q3985721 | 1992-06-27 | Paper |
A demand-to-manufacturing-requirement model based on predefined configurations | 1992-06-26 | Paper |
Simulation studies in JIT production | 1992-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5202020 | 1991-01-01 | Paper |
Fast evaluation of an unreliable transfer line with limited transportation devices | 1990-01-01 | Paper |
Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models | 1990-01-01 | Paper |
Performance evaluation of job-shop systems using timed event-graphs | 1989-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3780735 | 1988-01-01 | Paper |
Analyse de fabrications non linéaires et répétitives à l'aide de graphes d'événements temporisés | 1988-01-01 | Paper |
Study Of A Closed Loop Conveyor System | 1987-01-01 | Paper |
A top-down hierarchical classification method | 1987-01-01 | Paper |
Quasi-linear production systems: Optimization of the transportation system | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3727724 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3730316 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3751361 | 1986-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3677464 | 1985-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3691380 | 1985-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3696844 | 1985-01-01 | Paper |
Group technology in production management: The short horizon planning level | 1985-01-01 | Paper |
Inventory planning in a deterministic environment: Continuous time model with concave costs | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3217183 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3220331 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3330933 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3332722 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3335510 | 1984-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3678942 | 1983-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3337179 | 1982-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3659492 | 1982-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3914721 | 1981-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3951893 | 1981-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5663629 | 1973-01-01 | Paper |