Scheduling a maintenance activity to minimize total weighted completion-time
From MaRDI portal
Publication:1029850
DOI10.1016/j.camwa.2008.11.008zbMath1165.90465OpenAlexW2036730102MaRDI QIDQ1029850
Publication date: 13 July 2009
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.camwa.2008.11.008
Related Items (14)
Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities ⋮ Digital twin-enabled dynamic scheduling with preventive maintenance using a double-layer Q-learning algorithm ⋮ Integrated production scheduling and maintenance policy for robustness in a single machine ⋮ Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates ⋮ Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints ⋮ Minimizing total completion time on a single machine with a flexible maintenance activity ⋮ Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job ⋮ Scheduling with deterioration effects and maintenance activities under parallel processors ⋮ Equivalence of some different maintenance activities in single-machine scheduling ⋮ Optimization of scheduling problems with deterioration effects and an optional maintenance activity ⋮ Single-machine scheduling with maintenance activities and rejection ⋮ A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models ⋮ A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times ⋮ Single-machine scheduling with job-dependent machine deterioration
Cites Work
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
- Two-machine flowshop scheduling with availability constraints
- Machine scheduling with a rate-modifying activity
- Single-machine scheduling with periodic maintenance and nonresumable jobs.
- A two-machine flowshop scheduling problem with a separated maintenance constraint
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
- Planning Machine Maintenance in Two-Machine Shop Scheduling
- Scheduling a maintenance activity on parallel identical machines
- Scheduling jobs and maintenance activities on parallel machines
This page was built for publication: Scheduling a maintenance activity to minimize total weighted completion-time