On the unutilized capacity of a production-storage system
From MaRDI portal
Publication:1099070
DOI10.1016/0167-6377(87)90054-XzbMath0637.90048MaRDI QIDQ1099070
P. R. Parthasarathy, Moosa Sharafali
Publication date: 1987
Published in: Operations Research Letters (Search for Journal in Brave)
Markov renewal processesfinite capacityoverflowdemand not metone-product one- machine production/inventory problem
Related Items (8)
On the unutilized capacity of a production-storage system ⋮ A production-inventory model with randomly changing environmental conditions ⋮ A note on a production control model for a facility with limited storage capacity in a random environment ⋮ Unreliable production-inventory systems with hyper-exponential renewal demand processes ⋮ A \((T,S)\) inventory/production system with limited production capacity and uncertain demands ⋮ THE OPTIMAL INVENTORY CONTROL OF A SYSTEM WITH RANDOM LEAD TIME WHERE RANDOM SUPPLY INTERRUPTIONS AFFECT THE REPLENISHMENT ⋮ Unreliable production-inventory model with a two-phase Erlang demand arrival process ⋮ Supply interruptions in a lost-sales inventory system with random lead time
Cites Work
- On the unutilized capacity of a production-storage system
- A central limit theorem for a security of supply model
- Reliability and Inventory in a Production-Storage System
- The Compensation Method Applied to a One-Product Production/Inventory Problem
- Exceptional Paper—Markov Renewal Theory: A Survey
- A Production-Inventory Control Model with a Mixture of Back-Orders and Lost-Sales
- A simple model for a dam in continuous time with Markovian input
- Unnamed Item
- Unnamed Item
This page was built for publication: On the unutilized capacity of a production-storage system