Use of variable range in solving multiple criteria scheduling problems
From MaRDI portal
Publication:1200841
DOI10.1016/0305-0548(92)90074-FzbMath0825.90531OpenAlexW2073825725MaRDI QIDQ1200841
Rong-Hwa Huang, Ching-Jong Liao, Sheng-Tsaing Tseng
Publication date: 16 January 1993
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(92)90074-f
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty
- Solving a bicriterion scheduling problem
- A bicriterion approach to time/cost trade-offs in sequencing
- A note on the single-machine scheduling problem with minimum weighted completion time and maximum allowable tardiness
- Scheduling with Multiple Performance Measures: The One-Machine Case
- One machine sequencing to minimize mean flow time with minimum number tardy
- A note on the extension of a result on scheduling with secondary criteria