Ching-Jong Liao

From MaRDI portal
Person:418294

Available identifiers

zbMath Open liao.ching-jongMaRDI QIDQ418294

List of research outcomes





PublicationDate of PublicationType
A tropical cyclone-based method for global optimization2017-06-16Paper
Minimizing Makespan on Parallel Machines with Machine Eligibility Restrictions2015-10-14Paper
Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups2012-06-25Paper
An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times2012-05-28Paper
A linear programming approach to the electricity contract capacity problem2011-09-18Paper
Parallel machine scheduling with preference of machines2010-10-25Paper
Improved MILP models for two-machine flowshop with batch processing machines2009-07-19Paper
Minimizing the sum of job completion times on capacitated two-parallel machines2009-04-30Paper
Minimizing total tardiness on a single machine with controllable processing times2009-02-12Paper
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks2008-10-01Paper
Ant colony optimization combined with taboo search for the job shop scheduling problem2008-09-01Paper
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem2008-07-21Paper
A discrete version of particle swarm optimization for flowshop scheduling problems2007-04-26Paper
An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups2007-02-19Paper
Makespan minimization for two parallel machines with an availability constraint2004-11-22Paper
Makespan minimization subject to flowtime optimality on identical parallel machines2004-11-12Paper
An ant colony system for permutation flow-shop sequencing2004-06-15Paper
Survey of scheduling research involving setup times2002-10-24Paper
Single facility scheduling with major and minor setups1998-01-28Paper
Group scheduling on two cells with intercell movement1997-06-10Paper
Sequencing with setup time and order tardiness trade-offs1997-01-07Paper
Optimal scheduling of products with common and unique components1996-07-02Paper
Flow-shop scheduling with flexible processors1995-12-17Paper
The dynamic lot-sizing problem with variable unit costs1995-11-20Paper
A new node selection strategy in the branch-and-bound procedure1995-05-15Paper
An inventory system with multiple replenishment scheduling1995-02-13Paper
An efficient integer programming model of the dynamic lot-sizing problem1994-07-21Paper
Minimizing the Range of Order Completion Times with Multiple Job Classes1994-02-17Paper
Minimizing the Number of Machine Idle Intervals with Minimum Makespan in a Flow-Shop1994-01-02Paper
Tradeoff between setup times and carrying costs for finished items1993-12-20Paper
Optimal release time on a stochastic single machine1993-01-16Paper
Use of variable range in solving multiple criteria scheduling problems1993-01-16Paper
An Improved Formulation for the Job-Shop Scheduling Problem1992-12-16Paper
A heuristic for determining the optimal order in a tandem queue1992-06-28Paper
Stochastic inventory model with controllable lead time1992-06-26Paper
An Algorithm for Minimizing the Range of Lateness on a Single Machine1991-01-01Paper

Research outcomes over time

This page was built for person: Ching-Jong Liao