Ching-Jong Liao

From MaRDI portal
Person:418294

Available identifiers

zbMath Open liao.ching-jongMaRDI QIDQ418294

List of research outcomes

PublicationDate of PublicationType
A tropical cyclone-based method for global optimization2017-06-16Paper
Minimizing Makespan on Parallel Machines with Machine Eligibility Restrictions2015-10-14Paper
Neighborhood search procedures for single machine tardiness scheduling with sequence-dependent setups2012-06-25Paper
An improved heuristic for parallel machine weighted flowtime scheduling with family set-up times2012-05-28Paper
A linear programming approach to the electricity contract capacity problem2011-09-18Paper
Parallel machine scheduling with preference of machines2010-10-25Paper
Improved MILP models for two-machine flowshop with batch processing machines2009-07-19Paper
Minimizing the sum of job completion times on capacitated two-parallel machines2009-04-30Paper
Minimizing total tardiness on a single machine with controllable processing times2009-02-12Paper
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks2008-10-01Paper
Ant colony optimization combined with taboo search for the job shop scheduling problem2008-09-01Paper
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem2008-07-21Paper
A discrete version of particle swarm optimization for flowshop scheduling problems2007-04-26Paper
An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups2007-02-19Paper
Makespan minimization for two parallel machines with an availability constraint2004-11-22Paper
Makespan minimization subject to flowtime optimality on identical parallel machines2004-11-12Paper
An ant colony system for permutation flow-shop sequencing2004-06-15Paper
Survey of scheduling research involving setup times2002-10-24Paper
Single facility scheduling with major and minor setups1998-01-28Paper
Group scheduling on two cells with intercell movement1997-06-10Paper
Sequencing with setup time and order tardiness trade-offs1997-01-07Paper
Optimal scheduling of products with common and unique components1996-07-02Paper
Flow-shop scheduling with flexible processors1995-12-17Paper
The dynamic lot-sizing problem with variable unit costs1995-11-20Paper
A new node selection strategy in the branch-and-bound procedure1995-05-15Paper
An inventory system with multiple replenishment scheduling1995-02-13Paper
An efficient integer programming model of the dynamic lot-sizing problem1994-07-21Paper
Minimizing the Range of Order Completion Times with Multiple Job Classes1994-02-17Paper
Minimizing the Number of Machine Idle Intervals with Minimum Makespan in a Flow-Shop1994-01-02Paper
Tradeoff between setup times and carrying costs for finished items1993-12-20Paper
Use of variable range in solving multiple criteria scheduling problems1993-01-16Paper
Optimal release time on a stochastic single machine1993-01-16Paper
An Improved Formulation for the Job-Shop Scheduling Problem1992-12-16Paper
A heuristic for determining the optimal order in a tandem queue1992-06-28Paper
Stochastic inventory model with controllable lead time1992-06-26Paper
An Algorithm for Minimizing the Range of Lateness on a Single Machine1991-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Ching-Jong Liao