Grey integer programming: an application to waste management planning under uncertainty

From MaRDI portal
Publication:1388852

DOI10.1016/0377-2217(94)00093-RzbMath0899.90131OpenAlexW1990485541MaRDI QIDQ1388852

D. Massart

Publication date: 11 June 1998

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)00093-r



Related Items

Fuzzy two-stage quadratic programming for planning solid waste management under uncertainty, Dual inexact fuzzy chance-constrained programming for planning waste management systems, Generation of some methods for solving interval multi-objective linear programming models, A novel method for solving the fully fuzzy bilevel linear programming problem, An interval-parameter fuzzy nonlinear optimization model for stream water quality management under uncertainty, The outcome range problem in interval linear programming, Filter allocation and replacement strategies in fluid power system under uncertainty: a fuzzy robust nonlinear programming approach, Bivariate interval semi-infinite programming with an application to environmental decision-making analysis, Grey enterprise input-output analysis, A genetic-algorithms-based approach for programming linear and quadratic optimization problems with uncertainty, Corporate optimal production planning with varying environmental costs: a grey compromise programming approach., Integrated grey relational analysis and multi objective grey linear programming for sustainable electricity generation planning, ISMISIP: an inexact stochastic mixed integer linear semi-infinite programming approach for solid waste management and planning under uncertainty, Generalized fuzzy linear programming for decision making under uncertainty: feasibility of fuzzy solutions and solving approach, Violation analysis on two-step method for interval linear programming, Numerical solutions comparison for interval linear programming problems based on coverage and validity rates, A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems, Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach, Identification of optimal plans for municipal solid waste management in an environment of fuzziness and two-layer randomness, Evaluating green supplier development programs with a grey-analytical network process-based methodology, An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty, A dual-uncertainty-based chance-constrained model for municipal solid waste management, Identification of filter management strategy in fluid power systems under uncertainty: an interval-fuzzy parameter integer nonlinear programming method, A response to ``A comment on `Grey integer programming: an application to waste management planning under uncertainty{'} by Larry Jenkins, An improved three-step method for solving the interval linear programming problems, Monte Carlo simulation for computing the worst value of the objective function in the interval linear programming, Enhanced-interval linear programming, Siting recycling drop-off stations in urban area by genetic algorithm-based fuzzy multiobjective nonlinear integer programming modeling, An interval-valued fuzzy linear programming with infinite \(\alpha\)-cuts method for environmental management under uncertainty, Application of grey theory and multiobjective programming towards airline network design, ROBUST INTERVAL-BASED MINIMAX-REGRET ANALYSIS METHOD FOR FILTER MANAGEMENT OF FLUID POWER SYSTEM, Grey input-output analysis and its application for environmental cost allocation, An interval nonlinear program for the planning of waste management systems with economies-of-scale effects -- a case study for the region of Hamilton, Ontario, Canada



Cites Work