Supply chain optimization in the pulp mill industry -- IP models, column generation and novel constraint branches.
From MaRDI portal
Publication:1426678
DOI10.1016/j.ejor.2003.08.001zbMath1045.90021OpenAlexW2021016433MaRDI QIDQ1426678
Publication date: 15 March 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.08.001
Integer programming (90C10) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (17)
Centralized supply chain planning model for multiple forest companies ⋮ Integrated production and distribution planning for Södra Cell AB ⋮ A hybrid VNS approach for the short-term production planning and scheduling: a case study in the pulp and paper industry ⋮ Integrated maritime fleet deployment and speed optimization: case study from RoRo shipping ⋮ Fifty years of operational research in forestry ⋮ A Maritime Pulp Distribution Problem ⋮ Use of Lagrangian decomposition in supply chain planning ⋮ Supply Chain Planning Models in the Pulp and Paper Industry ⋮ A Modeling Framework for Maximizing Value Creation in Pulp and Paper Mills ⋮ Using Operational Research for Supply Chain Planning in the Forest Products Industry ⋮ Long-range timber supply planning for a vertically integrated paper mill ⋮ Risk management for forestry planning under uncertainty in demand and prices ⋮ Furniture supply chain tactical planning optimization using a time decomposition approach ⋮ Using robust optimization for distribution and inventory planning for a large pulp producer ⋮ On dealing with strategic and tactical decision levels in forestry planning under uncertainty ⋮ Multi-commodity supply network planning in the forest supply chain ⋮ Timed route approaches for large multi-product multi-step capacitated production planning problems
Cites Work
- Unnamed Item
- Lot sizing and scheduling -- survey and extensions
- MIP modelling of changeovers in production planning and scheduling problems
- The general lotsizing and scheduling problem
- Simultaneous lotsizing and scheduling on parallel machines
- Scheduling with batching: A review
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- Branch-and-Price: Column Generation for Solving Huge Integer Programs
- An Integer Programming Approach to the Vehicle Scheduling Problem
This page was built for publication: Supply chain optimization in the pulp mill industry -- IP models, column generation and novel constraint branches.