Risk management for forestry planning under uncertainty in demand and prices
From MaRDI portal
Publication:1754283
DOI10.1016/j.ejor.2017.12.022zbMath1403.90529OpenAlexW2778124780MaRDI QIDQ1754283
Antonio Alonso-Ayuso, Monique Guignard, Andrés P. Weintraub, Laureano Fernando Escudero Bueno
Publication date: 30 May 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2017.12.022
risk managementOR in natural resourcesoptimization under uncertaintyforestry planningconsistency in risk-averse measures
Related Items (16)
Fast scenario reduction by conditional scenarios in two-stage stochastic MILP problems ⋮ Assessing the value of natural gas underground storage in the Brazilian system via stochastic dual dynamic programming ⋮ COVID-19: data-driven optimal allocation of ventilator supply under uncertainty and risk ⋮ Risk-averse multi-stage stochastic optimization for surveillance and operations planning of a forest insect infestation ⋮ Some matheuristic algorithms for multistage stochastic optimization models with endogenous uncertainty and risk management ⋮ An energy system optimization model accounting for the interrelations of multiple stochastic energy prices ⋮ From scenarios to conditional scenarios in two‐stage stochastic MILP problems ⋮ Sample average approximation for risk-averse problems: a virtual power plant scheduling application ⋮ Scenario-dominance to multi-stage stochastic lot-sizing and knapsack problems ⋮ Optimal Option Purchasing Decisions for the Risk-Averse Retailer with Shortage Cost ⋮ A risk-averse stochastic program for integrated system design and preventive maintenance planning ⋮ On capacity expansion planning under strategic and operational uncertainties based on stochastic dominance risk averse management ⋮ On risk management of a two-stage stochastic mixed 0-1 model for the closed-loop supply chain design problem ⋮ On dealing with strategic and tactical decision levels in forestry planning under uncertainty ⋮ A parallelized variable fixing process for solving multistage stochastic programs with progressive hedging ⋮ Stage-\(t\) scenario dominance for risk-averse multi-stage stochastic mixed-integer programs
Cites Work
- Unnamed Item
- Medium range optimization of copper extraction planning under uncertainty in future copper prices
- Building up time-consistency for risk measures and dynamic optimization
- Risk aversion in multistage stochastic programming: a modeling and algorithmic perspective
- An SDP approach for multiperiod mixed 0-1 linear programming models with stochastic dominance constraints for risk management
- On air traffic flow management with rerouting. II: Stochastic case
- The optimal harvesting problem under price uncertainty
- Evaluating policies in risk-averse multi-stage stochastic programming
- Risk-averse dynamic programming for Markov decision processes
- Forestry management under uncertainty
- Stochastic optimization models in forest planning: a progressive hedging solution approach
- On a time consistency concept in risk averse multistage stochastic programming
- On parallelization of a stochastic dynamic programming algorithm for solving large-scale mixed \(0-1\) problems under uncertainty
- Dynamic generation of scenario trees
- Dynamic risk measures: Time consistency and risk measures from BMO martingales
- Optimization in forestry
- BFC, A branch-and-fix coordination algorithmic framework for solving some types of stochastic pure and mixed 0--1 programs.
- Supply chain optimization in the pulp mill industry -- IP models, column generation and novel constraint branches.
- Scenario cluster Lagrangean decomposition for risk averse in multistage stochastic optimization
- Branch-and-cut for the forest harvest scheduling subject to clearcut and core area constraints
- The optimal harvesting problem under price uncertainty: the risk averse case
- On the time-consistent stochastic dominance risk averse measure for tactical supply chain planning under uncertainty
- Model tightening for integrated timber harvest and transportation planning
- Lagrangean relaxation. (With comments and rejoinder).
- Scenario decomposition of risk-averse multistage stochastic programming problems
- Dynamic consistency for stochastic optimal control problems
- Risk-averse feasible policies for large-scale multistage stochastic linear programs
- Using robust optimization for distribution and inventory planning for a large pulp producer
- Scenario tree reduction for multistage stochastic programs
- Quasi-Monte Carlo methods for linear two-stage stochastic programming problems
- Optimization models for forest road upgrade planning
- Coherent multiperiod risk adjusted values and Bellman's principle
- Time consistency and risk averse dynamic decision models: definition, interpretation and practical consequences
- Measuring risk for income streams
- Conditional value-at-risk in stochastic programs with mixed-integer recourse
- The value of the stochastic solution in multistage problems
- Coherent Measures of Risk
- Time-Consistent Decisions and Temporal Decomposition of Coherent Risk Functionals
- Multistage Stochastic Optimization
- Introduction to Stochastic Programming
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
- A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation
- The Price of Robustness
- Lectures on Stochastic Programming
- Lagrangean decomposition: A model yielding stronger lagrangean bounds
- Stochastic Programs with Fixed Recourse: The Equivalent Deterministic Program
- Building a stochastic programming model from scratch: a harvesting management example
- On Solving Multistage Stochastic Programs with Coherent Risk Measures
This page was built for publication: Risk management for forestry planning under uncertainty in demand and prices