Allocation of tasks to specialized processors: A planning approach
From MaRDI portal
Publication:1584818
DOI10.1016/S0377-2217(99)00282-9zbMATH Open0970.90042OpenAlexW2120157007MaRDI QIDQ1584818FDOQ1584818
Authors: K. J. Becker, P. A. Jacobs, D. P. jun. Gaver, Kevin D. Glazebrook, Siriphong Lawphongpanich
Publication date: 5 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(99)00282-9
Recommendations
- Ordonnancement de tâches sur un système multiprocesseur - modèles déterministes et modèles stochastiques
- Assigning multiple job types to parallel specialized servers
- Task allocation in a multi-server system
- Performance of service policies in a specialized service system with parallel servers
- Dynamic policies for uncertain time‐critical tasking problems
Cites Work
- Title not available (Why is that?)
- Multiclass Queueing Systems: Polymatroidal Structure and Optimal Scheduling Control
- Title not available (Why is that?)
- Optimal load balancing and scheduling in a distributed computer system
- A Queueing System with General-Use and Limited-Use Servers
- The Bilingual Server System: A Queueing Model Featuring Fully And Partially Qualified Servers
- Service-Adaptive Multitype Repairman Problems
- Title not available (Why is that?)
- Scheduling with Random Arrivals and Linear Loss Functions
Cited In (8)
- Improving routing decisions in parallel non-observable queues
- DYNAMIC ROUTING OF CUSTOMERS WITH GENERAL DELAY COSTS IN A MULTISERVER QUEUING SYSTEM
- Assigning multiple job types to parallel specialized servers
- Size- and state-aware dispatching problem with queue-specific job sizes
- On the value function of the M/G/1 FCFS and LCFS queues
- Modeling and analysis of uncertain time-critical tasking problems
- Performance of service policies in a specialized service system with parallel servers
- Task allocation in a multi-server system
Uses Software
This page was built for publication: Allocation of tasks to specialized processors: A planning approach
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1584818)