Using real time information for effective dynamic scheduling
From MaRDI portal
Publication:1604065
DOI10.1016/S0377-2217(01)00355-1zbMath1001.90033OpenAlexW2070864666MaRDI QIDQ1604065
Marcus Johansson, Peter I. Cowling
Publication date: 3 July 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00355-1
Related Items (12)
Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis ⋮ Real-time production scheduling in the Industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns ⋮ Integrated real-time control of mixed-model assembly lines and their part feeding processes ⋮ Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry ⋮ Real-time production planning and control system for job-shop manufacturing: a system dynamics analysis ⋮ Aversion scheduling in the presence of risky jobs ⋮ Flow shop scheduling on 2-machines with setup time and single transport facility under fuzzy environment ⋮ Dynamic optimisation of preventative and corrective maintenance schedules for a large scale urban drainage system ⋮ A survey of dynamic scheduling in manufacturing systems ⋮ Dynamic scheduling for complex engineer-to-order products ⋮ An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns ⋮ Dynamic interactive stabilization of the switching Kumar-Seidman system
Cites Work
- One-machine rescheduling heuristics with efficiency and stability as criteria
- Integration of continuous caster and hot strip mill planning for steel production
- Match-up scheduling under a machine breakdown
- Matchup Scheduling with Multiple Resources, Release Dates and Disruptions
- Information and scheduling in a dual resource constrained job shop
- Production scheduling/rescheduling in flexible manufacturing
- Heuristics for dynamic job shop scheduling with real-time updated queueing time estimates
- Anytime heuristic schedule repair in manufacturing industry
- Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
This page was built for publication: Using real time information for effective dynamic scheduling