A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: a graph-theoretic view
From MaRDI portal
Publication:1634582
DOI10.1016/j.apm.2014.05.011zbMath1428.90062OpenAlexW2073394865MaRDI QIDQ1634582
Hamed Rafiei, Masoud Rabbani, Mina Monshi
Publication date: 18 December 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2014.05.011
schedulinggenetic algorithmlead timedynamic graphadvanced available-to-promiseflowshop production system
Cites Work
- Unnamed Item
- Available-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic case
- Optimization-based available-to-promise with multi-stage resource availability
- New models for shortest path problem with fuzzy arc lengths
- Inventory reservation and real-time order promising in a make-to-stock system
- Customer segmentation, allocation planning and order promising in make-to-stock production
- Material compatibility constraints for make-to-order production planning.
- Optimal planning in large multi-site production networks
- Genetic algorithms for rerouting shortest paths in dynamic and stochastic networks
- Multimodal K-shortest viable path problem in Tehran public transportation network and its solution applying ant colony and simulated annealing algorithms
- Component rationing for available-to-promise scheduling in configure-to-order systems
This page was built for publication: A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: a graph-theoretic view