Optimization-based available-to-promise with multi-stage resource availability
From MaRDI portal
Publication:816352
DOI10.1007/s10479-005-6235-7zbMath1112.90306OpenAlexW2059044280MaRDI QIDQ816352
Masahiro Kotake, Michael O. Ball, Zhen-Ying Zhao
Publication date: 10 March 2006
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/1903/6469
mixed-integer-programmingavailable-to-promisemanufacturing orderorder-promising and fulfillmentproduction capability
Related Items (7)
A new AATP model with considering supply chain lead-times and resources and scheduling of the orders in flowshop production systems: a graph-theoretic view ⋮ Newsvendor problems with demand forecast updating and supply constraints ⋮ Modelling and integration of customer flexibility in the order commitment process for high mix low volume production ⋮ A hierarchical system for effective coordination of available-to-promise logic mechanisms ⋮ A fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots ⋮ Available-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic case ⋮ Revenue management approach to due date quoting and scheduling in an assemble-to-order production system
Cites Work
- Unnamed Item
- Unnamed Item
- Survey of scheduling research involving due date determination decisions
- Material compatibility constraints for make-to-order production planning.
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- Integrating order release control with due-date assignment rules
- Quoting Customer Lead Times
- Customer-Order Information, Leadtimes, and Inventories
This page was built for publication: Optimization-based available-to-promise with multi-stage resource availability